Dock pilings in Fort Lauderdale
Fort Lauderdale dock pilings started only once the Broward County license is in hand.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We replace cracked and worn pilings, add new ones for lifts and extensions, and wrap them to slow marine borer damage.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Fort Lauderdale work follows Broward's manatee protection zones (rule 68C-22.010) and stops when a manatee is within 50 ft. Any Fort Lauderdale dock, piling or seawall work in the water needs a Broward County license before it starts.
Last updated
Signs a piling needs replacing
Check at low tide.
- Wood worn thin at the waterline (an hourglass shape)
- Deep splits or a piling that moves when you push it
- A dock that sags between pilings
The Broward County license comes first
Broward County requires its own license before any work in, on, over or under county waters, and that includes repairing or replacing a dock or seawall. Pile replacement, lift repairs that touch the pilings and seawall work all need that county license before work starts, on top of the City permit.
Pile replacement waits for that approval.[1]
Broward manatee zones
Broward County's manatee protection zones are set in state rule 68C-22.010, with boating restricted areas in 68D-24.008. In-water crews on the Intracoastal and the New River follow the slow-speed zones and stop work whenever a manatee comes within 50 ft.

Pile driving is in-water work, so the manatee rules set the pace.[2][3]
What makes Fort Lauderdale different
The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[4][5]

The county layer
Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[1][4]

Permits in Fort Lauderdale
- Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
- City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.
How pilings go in
Pilings are driven or jetted into the bottom from a barge or the dock. Federal SPGP VI did not authorise impact-hammer installation of metal pipe or metal sheet piles, so steel work takes a different federal route. All in-water work follows the state manatee conditions: work stops if a manatee comes within 50 ft.[11][3]

| Item | Figure | Source and scope |
|---|---|---|
| Replacing a piling | $300 to $1,600 each | Fixr, national, 2025 |
| Piling dock, installed | $20 to $40 per sq ft | Fixr, national, 2025 |
Frequently asked questions
Do I need a county license to repair my dock in Fort Lauderdale?
Yes. Broward County requires a license before any work in, on, over or under its waters, including repair or replacement of a dock or seawall.
Do manatee rules apply in Fort Lauderdale canals?
Yes. Broward's zones under rule 68C-22.010 set boat speeds, and the state conditions stop in-water work while a manatee is within 50 ft.
Sources
- Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
- Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
- King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
- City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
- Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
- Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
- Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.