Composite dock decking in Fort Lauderdale
Composite dock decking in Fort Lauderdale, started only once the Broward County license is in hand.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We re-deck existing docks and deck new ones, checking the framing and fasteners while the boards are up.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Any Fort Lauderdale dock, piling or seawall work in the water needs a Broward County license before it starts. Fort Lauderdale limits docks and boat lifts to 25% of the waterway width or 25 ft from the property line, whichever is less.
Last updated
Who re-decks
Owners with splintering or soft boards on sound framing, and owners building a new dock who want less upkeep.
The Broward County license comes first
Broward County requires its own license before any work in, on, over or under county waters, and that includes repairing or replacing a dock or seawall. Pile replacement, lift repairs that touch the pilings and seawall work all need that county license before work starts, on top of the City permit.
New decking is only as good as the frame and piles under it, so we check them first.[1]
The 25% or 25 ft limit
ULDR 47-19.3(c) limits docks, lifts and other mooring structures to 25% of the waterway width or 25 ft, whichever is less, measured from the property line. On a 60 ft canal that is 15 ft; on the wide New River reaches the 25 ft cap takes over.
A redeck is the moment to check that the dock still fits the limit if you add width.[2]
Going past the limit
The City Commission can waive the projection limit on a finding of extraordinary circumstances. The application fee is $1,500, and the Marine Advisory Board looks at it first: in May 2026 it backed, 12 to 0, a boat lift reaching 27 ft 8 in at 1614 Brickell Drive.[2]

What makes Fort Lauderdale different
The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[3][4]

The county layer
Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[1][3]

Permits in Fort Lauderdale
- Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
- City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.
What we check before re-decking
- Joists and stringers for rot
- Fasteners and hardware for corrosion
- Pilings at the waterline
- Board spacing rules for your waterway
Frequently asked questions
Do I need a county license to repair my dock in Fort Lauderdale?
Yes. Broward County requires a license before any work in, on, over or under its waters, including repair or replacement of a dock or seawall.
How far can a dock or lift extend in Fort Lauderdale?
25% of the waterway width or 25 ft from the property line, whichever is less (ULDR 47-19.3(c)). Longer structures need a City Commission waiver.
Can I get a longer boat lift approved in Fort Lauderdale?
Yes, through a waiver of limitations: a $1,500 application, a Marine Advisory Board recommendation and a City Commission decision. A 27 ft 8 in lift was recommended 12 to 0 in May 2026.
Sources
- Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
- City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
- King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
- Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
- Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.

