SoFlo Marine Construction

Boat davits in Jupiter

Jupiter boat davits set parallel to the bulkhead, as the Town requires on canals.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We mount davits on seawalls and docks, check the wall can carry the load and handle the permit.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

On Jupiter canals, docks, boat lifts and PWC lifts must run parallel to the bulkhead (Town Code 27-2626). In Jupiter the top of a seawall cap must be at or below the property's base flood elevation, read from FEMA maps effective 20 December 2024.

Last updated

Who davits suit

Owners of tenders, small boats and jet skis with a sound seawall or dock and limited room for a lift slip.

Lifts sit parallel to the bulkhead

Town Code 27-2626(b)(11) requires docks, boat lifts and personal watercraft lifts in canals to sit parallel to the bulkhead. A lift set at right angles to the wall is not allowed on a Jupiter canal without a dock waiver.

Red lighthouse above the Loxahatchee River near Jupiter Inlet, with mangrove shorelines and private docks
Illustration: red lighthouse above the Loxahatchee River near Jupiter Inlet, with mangrove shorelines and private docks.

Davits count as mooring structures, so the same reach and setback rules apply.[1]

A cap no higher than base flood elevation

Jupiter caps seawalls from above: the top of the concrete cap, in NAVD, must be at or below the property's base flood elevation (Code 27-2624(8)). Since FEMA's new maps took effect on 20 December 2024, the BFE on the current map is the number to check before a cap is designed.

Davits bolt to the seawall cap, so the wall's height and condition come first.[2][3]

Half the waterway stays open

Jupiter keeps a centreline channel of 50% of the waterway width unobstructed, or at least 15 ft where that is impossible, and allows only rectangular, T and L docks unless the Director approves another shape. Piles for docks and lifts are laid out against that channel line first.

Personal watercraft on a floating drive-on lift beside a dock, with white boat davits on the seawall

Piling rules apply to every structure we drive into the bottom.[1]

What makes Jupiter different

Town Code 27-2626 keeps half of every waterway clear: a centreline channel of 50% of the waterway width must stay unobstructed, or at least a 15 ft channel where that cannot be met. Only rectangular, T and L shaped docks are allowed unless the Planning and Zoning Director approves another shape.[1]

Residential seawall with limestone riprap at its toe on a calm tidal river with mangroves upstream

Who approves what

The Town's checklists ask for FDEP self-certification or exemption verification, Army Corps approval if not included in the DEP decision, and SFWMD approval for structures on submerged lands or in natural waterways such as the Loxahatchee River, the Intracoastal Waterway and Sawfish Bay.[2][4]

T-shaped dock and a boat lift parallel to the bulkhead on a narrow residential canal

Permits in Jupiter

  • Town of Jupiter Building and Planning and Zoning: Marine structure permits; dock waivers under Town Code 27-2626.
  • Florida DEP or South Florida Water Management District: FDEP self-certification or exemption verification for canal docks; SFWMD approval for structures in the Loxahatchee River, the Intracoastal and Sawfish Bay.
  • US Army Corps of Engineers, Jacksonville District: Army Corps approval where the FDEP decision does not include it, as the Town checklists note.

Before we mount a davit

  1. Check the seawall cap or dock framing can carry the load
  2. Confirm the reach against the 25% waterway rule
  3. Permit with DERM and the city
  4. Mount, wire and test
[5]

Frequently asked questions

Can I install a boat lift perpendicular to my seawall in Jupiter?

Not on a canal. Town Code 27-2626(b)(11) requires docks, boat lifts and PWC lifts in canals to be parallel to the bulkhead.

Is there a maximum seawall height in Jupiter?

Yes. The top of the cap in NAVD must be less than or equal to the property's base flood elevation (Code 27-2624(8)).

What dock shapes are allowed in Jupiter?

Rectangular, T and L docks, and shared U-shaped terminal platforms, unless the Planning and Zoning Director approves another shape. Half the waterway must stay open.

Sources

  1. Application for Dock Waiver (form dated 14 Mar 2016, quoting Town Code 27-2626), Town of Jupiter Department of Planning and Zoning. Accessed October 28, 2026.
  2. Marine Structure: Seawalls permit checklist (revised January 2021), Town of Jupiter Building Department. Accessed October 28, 2026.
  3. Flood Zones and Insurance Information, Town of Jupiter. Accessed October 28, 2026.
  4. Marine Structure: Docks permit checklist (revised January 2021), Town of Jupiter Building Department. Accessed October 28, 2026.
  5. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.