SoFlo Marine Construction

Seawall replacement cost in South Florida (2026 guide)

Updated 2 min readBy SoFlo Marine Construction

Newly installed precast seawall panels with a fresh cap beside an older dark neighbouring wall
Contents

Government figures put a new or replacement seawall in South Florida at $650 to $2,000 per linear foot (Fort Lauderdale contractor survey, 2016), and Miami Beach's rule of thumb was $1,000 to $1,500 per linear foot to bring an old wall up to code (2017). Engineering and permitting added $2,000 to $5,000 per job, and prices have risen since.

How much does a seawall cost per foot?

The best public figures come from city governments. In May and June 2016, the City of Fort Lauderdale surveyed seawall contractors and found $650 to $2,000 per linear foot, depending on the depth of the waterway and where the wall sits.[1] In 2017, Miami Beach told owners to expect $1,000 to $1,500 per linear foot to bring an old seawall up to code.[2]

Seawall cost figures from South Florida governments
ItemFigureYear and source
New or replacement seawall$650 to $2,000 per linear foot2016, Fort Lauderdale
Old seawall brought up to code$1,000 to $1,500 per linear foot2017, Miami Beach
Engineering and permitting$2,000 to $5,000 per job2016, Fort Lauderdale
Adding a 12-inch cap$75 to $125 per linear foot2016, Fort Lauderdale
Cap spall repair$60 per cubic foot of epoxy mortar2016, Fort Lauderdale
These figures pre-date recent price rises and the newer, higher elevation rules. Use them for scale. Sources: Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017); City of Miami Beach, Rising Above the Risk: Frequently Asked Questions (05/05/2017). Last updated October 28, 2026.

What a 75 foot seawall works out at

On a typical 75 foot lot, the 2016 range of $650 to $2,000 per linear foot is about $48,750 to $150,000, before engineering, permits, dock or lift resets and yard repair.[1] The national cost guides that AI answers often quote are based on lake and inland walls, which are smaller and simpler than a tidal wall on Biscayne Bay or the Intracoastal.

Precast concrete seawall panels and rebar cages staged on a waterfront lot beside a canal
Precast seawall panels and rebar cages staged before installation.

What drives the price?

  • Water depth and wall height. Deeper water means longer panels or sheet piles, and city height rules mean taller walls.
  • Access. Most walls are built from a barge; tight canals and low bridges add time.
  • The old wall. Most new walls go in front of the old one, within the 18 inch limit in Florida law and Miami-Dade's short form.[4][3]
  • Permits and engineering. Fort Lauderdale's survey put these at $2,000 to $5,000 per job.[1]
  • Height rules. A wall built to Miami Beach's 5.7 ft NAVD or Coral Gables' 6 ft NGVD 1929 costs more than a like-for-like replacement.[5][6]
Yellow turbidity curtain enclosing a seawall work area on a calm canal

Permit fees in Miami-Dade

DERM's Class I fees depend on construction cost. For a $20,000 to $74,999 job, the application fee is $470 plus $25 per $1,000 above $10,000, and the short-form permit fee is the same formula, both plus a 7.5% surcharge.[3] Your city's building permit fee is separate.

Seawall replacement on a residential canal with new precast panels, a work barge with a crane and a turbidity curtain

Grants and fee breaks

  • Miami Beach: the Private Property Adaptation program reimburses 50% of eligible costs up to $20,000.[7]
  • Coral Gables: a fee waiver for existing homes raising seawalls for sea level rise, and a 20% fee cut for living seawalls.[8]

How long will a new seawall last?

Fort Lauderdale's ordinance FAQ assumed a design life of about 50 years, and city engineers described 30 to 50 years for a wall built today.[1]

Get a real number

The only accurate price is a quote for your wall. Start with seawall replacement or seawall repair, or see the rules in Miami Beach and Coral Gables.

Find a pro in your area

Enter your ZIP code and we will open the quote form for you. It takes about a minute.

Frequently asked questions

How much does it cost to replace a seawall in Florida?

City government figures for South Florida put it at $650 to $2,000 per linear foot (Fort Lauderdale, 2016) and $1,000 to $1,500 per linear foot to bring an old wall up to code (Miami Beach, 2017), plus $2,000 to $5,000 for engineering and permits.

How much does a 100 foot seawall cost?

At the 2016 Fort Lauderdale range of $650 to $2,000 per linear foot, about $65,000 to $200,000 before engineering, permits and other work. Expect more today.

Is seawall replacement covered by grants?

In Miami Beach, the PPA grant reimburses 50% of eligible costs up to $20,000. Coral Gables offers fee breaks rather than grants.

Sources

  1. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  2. Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
  3. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  4. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  5. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  6. CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
  7. Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  8. Solar, Open Air Dining, and Other Permits, City of Coral Gables. Accessed October 27, 2026.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!