Boat lift repair in Islamorada
Boat lift repair in Islamorada, where covered lifts are allowed only over cut-in slips on canals.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We find why a lift has stopped working, from motors and switches to cables, pulleys, gearboxes and bunks, and fix it with marine-grade parts.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Islamorada allows covered boat lifts only over cut-in slips on man-made canals, with roofs no more than 12 ft above grade (Ordinance 24-15). In Islamorada, NGVD29 and NAVD88 elevations differ by about 1.5 ft on average, so old and new drawings must be converted before comparing.
Last updated
Common boat lift faults
Stop using the lift if you see frayed cables or the boat sits unevenly.
- Motor hums but the lift does not move
- Lift raises unevenly or one side drops
- Frayed, kinked or flattened cables
- Grinding from the gearbox or pulleys
- Corroded switches and wiring
Covered lifts only over cut-in slips
Ordinance 24-15 allows open-sided covered boat lifts in Islamorada only over a cut-in slip on a man-made canal. The roof may not reach past the mouth of the slip or over mangroves, seagrass or hard bottom, may be no more than 12 ft above grade, and may not carry a deck.

A repair keeps the lift where it is; moving or enlarging it means meeting today's rule.[1]
Watch the datum: about 1.5 ft
The Village notes that converting from NGVD29 to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County, and the shift varies from place to place. Old plans and new maps use different datums, so a cap or floor height has to be converted before anyone compares numbers.
Repairs are scheduled when the cradle can be worked on above the water.[2]
Bay side and ocean side tides differ fourfold
NOAA's Florida Bay gauge at Upper Matecumbe Key shows a great diurnal range of only 0.61 ft, with mean higher high water about 0.41 ft below NAVD 88, while the Hawk Channel gauge a short way across the key shows 2.28 ft (1983 to 2001 epoch). A lift or floating dock sized for one side of Islamorada is wrong for the other.

What makes Islamorada different
Principal buildings sit 20 ft from the mean high water line on altered shorelines such as canals, 30 ft on open water with conditions, and 50 ft on unaltered shorelines. Docks, lifts, davits, seawalls and riprap are water-dependent structures that may sit inside that setback under the Village's standards.[1]

Sanctuary and manatee layers
The federal small-project permit, SPGP VI, required Sanctuary sign-off before any Islamorada project in Keys waters, and crews follow the state manatee conditions on every in-water job.[5][6]

Permits in Islamorada
- Islamorada, Village of Islands, Planning and Development Services: Docks, lifts and shoreline structures under Village Code Chapter 30.
- Florida Keys National Marine Sanctuary: Sanctuary waters surround every Islamorada key from the mean high water mark; we confirm what Sanctuary approval each project needs.
- Florida DEP or South Florida Water Management District: State permit or exemption; part of the Village's water is the Lignumvitae Key Aquatic Preserve.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Sanctuary waters around the Village.
What causes most failures
In salt water, galvanic corrosion attacks metal parts, which is why sacrificial zinc anodes need regular replacement. Cables should be checked for fraying, corrosion, kinks, flattened sections and uneven tension, and pulleys and gearboxes need lubrication.[7]

Repair or replace the lift?
If the frame and beams are sound, replacing the motor, cables or gearbox is usually far cheaper than a new lift, which ThePricer puts at $7,000 to $14,000 installed for a 10,000 lb four-post model in South Florida.[8]

Frequently asked questions
Can I put a roof over my boat lift in Islamorada?
Only an open-sided cover over a cut-in slip on a man-made canal, no higher than 12 ft above grade, not over mangroves, seagrass or hard bottom, and with no deck on top.
Why do elevations on old Islamorada plans look different?
They may be in NGVD29. The Village says converting to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County.
Why does it matter which side of Islamorada I live on?
Because the tide is very different: about 0.61 ft great diurnal range on Florida Bay and 2.28 ft on Hawk Channel, per NOAA gauges at Upper Matecumbe Key.
Sources
- Ordinance No. 24-15 amending Village Code Sec. 30-1542 Shoreline Setback, with Department of Commerce Final Order COM-24-043, Islamorada, Village of Islands. Accessed October 28, 2026.
- Floodplain Management, Islamorada, Village of Islands, Building Department. Accessed October 28, 2026.
- Datums for station 8723808, Islamorada, Upper Matecumbe Key, Florida Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723814, Upper Matecumbe Key, Hawk Channel (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Top Boat Lift Maintenance Tips (31 Jul 2025), ShoreMaster (boat lift manufacturer). Accessed October 27, 2026.
- How Much Does a Boat Lift Cost? (updated 11 Aug 2026), ThePricer.org (secondary cost guide; cited in the FCC master plan). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
