Boat lifts in Islamorada
Boat lifts and covered lifts in Islamorada, to Village rules.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We install new boat lifts and jet ski lifts, repair motors, cables and gearboxes, and service lifts so they keep working through the season.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Islamorada allows open-sided covered boat lifts only over a cut-in boat slip on a manmade canal; the lift may not extend past the mouth of the slip or over mangroves, seagrass or hard bottom, the roof may be no more than 12 ft above grade, and no deck may be built on it (Village Code 30-1542, 2024). Uncovered lifts follow the general dock rules.
Last updated
Typical project sizes
Most residential lifts are four-post or elevator lifts in the 10,000 lb class, plus PWC lifts. New pilings can turn a $10,000 lift project into $15,000 or more (ThePricer, 2026).
Roof edges and setbacks
The roof and supports of a covered lift may extend 2 ft into the shoreline setback around the perimeter of the slip, but no decks or habitable space are allowed on the roof.[1]

Existing slips
Under SPGP VI, boat lifts in existing slips in Monroe County did not need a seagrass survey, which made an existing cut-in slip the simplest place for a new lift.[2]
Bay side and ocean side tides differ fourfold
NOAA's Florida Bay gauge at Upper Matecumbe Key shows a great diurnal range of only 0.61 ft, with mean higher high water about 0.41 ft below NAVD 88, while the Hawk Channel gauge a short way across the key shows 2.28 ft (1983 to 2001 epoch). A lift or floating dock sized for one side of Islamorada is wrong for the other.

Lift travel is set from that tide range plus your boat's draft.[4][5]
Watch the datum: about 1.5 ft
The Village notes that converting from NGVD29 to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County, and the shift varies from place to place. Old plans and new maps use different datums, so a cap or floor height has to be converted before anyone compares numbers.[6]
What makes Islamorada different
Principal buildings sit 20 ft from the mean high water line on altered shorelines such as canals, 30 ft on open water with conditions, and 50 ft on unaltered shorelines. Docks, lifts, davits, seawalls and riprap are water-dependent structures that may sit inside that setback under the Village's standards.[1]

Sanctuary and manatee layers
The federal small-project permit, SPGP VI, required Sanctuary sign-off before any Islamorada project in Keys waters, and crews follow the state manatee conditions on every in-water job.[2][7]

Permits for boat lifts in Islamorada
- Islamorada, Village of Islands, Planning and Development Services: Docks, lifts and shoreline structures under Village Code Chapter 30.
- Florida Keys National Marine Sanctuary: Sanctuary waters surround every Islamorada key from the mean high water mark; we confirm what Sanctuary approval each project needs.
- Florida DEP or South Florida Water Management District: State permit or exemption; part of the Village's water is the Lignumvitae Key Aquatic Preserve.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Sanctuary waters around the Village.
Lift permits in South Florida
In Miami-Dade a boat lift on a new or existing dock, seawall or bulkhead is a short-form DERM permit, and a single-family lift may not protrude more than 25% of the waterway width. Palm Beach County treats lifts as Type 8 marine structures and asks for signed and sealed lift drawings with pile details. Under SPGP VI, lifts could go in existing boat slips without a seagrass survey, and two uncovered lifts were allowed.[8][9][2]

How long should a boat lift last?
Manufacturers we checked do not publish a fixed lifespan. What they do publish is upkeep: rinse after each use, inspect at least once a season, have it serviced at least once a year (more often in salt water), replace worn cables at once and change sacrificial zinc anodes regularly.[10]

| Item | Figure | Source and scope |
|---|---|---|
| 10,000 lb four-post lift, installed | $7,000 to $14,000 | ThePricer, South Florida, 2026 |
| PWC or jet ski lift, installed | $3,000 to $10,000 | ThePricer, South Florida, 2026 |
| 10,000 lb elevator lift, equipment only | About $12,480 | ThePricer, 2026 |
| Installation labour | $500 to $3,000 or more | ThePricer, 2026 |
Boat lifts services in Islamorada
Boat lift installation in Islamorada
New four-post, elevator and floating boat lifts, including relocations.
Boat lift repair in Islamorada
Lifts that will not raise, stall, tilt or make noise.
Boat lift motors and cables in Islamorada
Motor, gearbox, cable, pulley and switch replacement.
PWC and jet ski lifts in Islamorada
Floating and fixed lifts for jet skis and small tenders.
Boat lift service and maintenance in Islamorada
Yearly servicing: cables, lubrication, anodes, switches and bunks.
Frequently asked questions
How high can a boat lift roof be in Islamorada?
No more than 12 ft above grade at its highest point.
Can I put a covered lift on open water in Islamorada?
No. Covered lifts are allowed only over cut-in slips on manmade canals.
Sources
- Ordinance No. 24-15 amending Village Code Sec. 30-1542 Shoreline Setback, with Department of Commerce Final Order COM-24-043, Islamorada, Village of Islands. Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- How Much Does a Boat Lift Cost? (updated 11 Aug 2026), ThePricer.org (secondary cost guide; cited in the FCC master plan). Accessed October 27, 2026.
- Datums for station 8723808, Islamorada, Upper Matecumbe Key, Florida Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723814, Upper Matecumbe Key, Hawk Channel (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Floodplain Management, Islamorada, Village of Islands, Building Department. Accessed October 28, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- TYPE 8 Marine Structures (Dock, Seawall, Boatlift, Boathouse) Application Submittal Checklist, Palm Beach County Planning, Zoning and Building. Accessed October 27, 2026.
- Top Boat Lift Maintenance Tips (31 Jul 2025), ShoreMaster (boat lift manufacturer). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
