Marine pile driving in Key Largo
Marine pile driving in Key Largo, on non-leaching or sleeved piles, as Monroe County requires.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
Barge-mounted pile driving and jetting for new docks, lift slips, mooring piles and seawall support piles.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Key Largo dock pilings must be recycled plastic, concrete or wrapped in a 30 mil sleeve from below the bottom to 2 ft above high water. Key Largo docks must reach 4 ft of water at mean low water, and over seagrass the deck must sit 5 ft above mean high water with a platform no larger than 160 sq ft.
Last updated
Who needs pile driving
Owners building a new dock or lift slip, adding mooring piles, or replacing failed pilings.
No leaching piles
Every dock piling in unincorporated Monroe County must be non-CCA-leaching, such as recycled plastic or concrete, or be wrapped in an impermeable sleeve at least 30 mil thick from 6 in below the bottom to 2 ft above mean high water. That changes the piling order before a Key Largo job starts.

We order and drive piles to that rule.[1]
Four feet of water, and more over grass
A Key Largo dock must end in at least 4 ft of water at mean low water. Over seagrass or hard bottom, the water must be 4 ft deep above the organisms, the deck at least 5 ft above mean high water, and the terminal platform no larger than 160 sq ft (8 by 20 ft), with a benthic survey to prove it.
Barges and spuds are kept off grass beds.[1]
The Sanctuary starts at high water
The shoreward boundary of the Florida Keys National Marine Sanctuary is the mean high water mark, so once work steps into Key Largo's water it is inside the Sanctuary. Monroe County lists boating restricted areas under rule 68D-24.144, and County approvals wait on state and federal permits before a Notice to Proceed.

Pile driving stops whenever a manatee comes within 50 ft, so watchers are posted.[2][3][1]
What makes Key Largo different
The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[4]

Sanctuary, seagrass and manatees
Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[5][6]

Permits in Key Largo
- Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
- Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
- Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
- US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.
Rules that shape pile work
Under SPGP VI, impact-hammer installation of metal pipe or metal sheet piles was not authorised, so steel piles needed a separate federal review. All in-water work stops when a manatee comes within 50 ft and restarts once it has moved beyond 50 ft or 30 minutes pass without it reappearing; project vessels run at idle speed and no wake.[5][6]

| Item | Figure | Source and scope |
|---|---|---|
| Replacing an individual piling | $300 to $1,600 | Fixr, national, 2025 |
Frequently asked questions
What pilings can I use in Key Largo?
Non-CCA-leaching piles such as recycled plastic or concrete, or treated piles wrapped in a sleeve of at least 30 mil from 6 in below the bottom to 2 ft above mean high water.
Can I build a dock over seagrass in Key Largo?
Only if there is 4 ft of water above the grass at mean low water, the deck is at least 5 ft above mean high water and the platform is no larger than 160 sq ft, backed by a benthic survey.
Is my Key Largo canal inside the marine sanctuary?
Yes. The Sanctuary's shoreward boundary is the mean high water mark, so in-water work is inside it and needs the matching state and federal approvals.
Sources
- Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
- Florida Keys National Marine Sanctuary, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
- Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
- Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
- Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
- Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.