Marine pile driving in Miami

Marine pile driving in Miami, starting with exempt removal of old piles and docks.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

Barge-mounted pile driving and jetting for new docks, lift slips, mooring piles and seawall support piles.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

In Miami, removing old piles or a dilapidated dock, lift or davit is exempt from DERM permitting, as is like-for-like decking repair. Miami's bayfront sits in the Biscayne Bay Aquatic Preserve, so an exempt private dock is capped at 500 sq ft over the water instead of the 1,000 sq ft allowed on artificial canals.

Last updated

Who needs pile driving

Owners building a new dock or lift slip, adding mooring piles, or replacing failed pilings.

Old piles and wrecked docks

DERM exempts removing old piles and dilapidated docks, lifts and davits, and repairing dock decking or handrails to their original size. In older Miami neighbourhoods along the river many jobs start with that clean-out, so it can begin before the permit for the new structure is issued.

Bayfront homes with seawalls and docks in the foreground and the downtown Miami skyline across Biscayne Bay
Illustration: bayfront homes with seawalls and docks in the foreground and the downtown Miami skyline across Biscayne Bay.

We order and drive piles to that rule.[1]

Bayfront lots sit on Outstanding Florida Waters

The Biscayne Bay Aquatic Preserve covers 64,607 acres from the Oleta River to Card Sound and is treated as Outstanding Florida Waters. On open bay frontage that halves the state dock exemption to 500 sq ft of over-water area, against 1,000 sq ft on an artificial canal, and seagrass damage in the preserve can bring a fine of up to $1,000.

Barges and spuds are kept off grass beds.[2][3][4]

Manatee zones in Miami-Dade waters

Miami-Dade's manatee protection zones are set in state rule 68C-22.025, with boating restricted areas under 68D-24.013. For in-water work that means slow-speed zones for work boats and the full state manatee conditions: everything stops if a manatee comes within 50 ft, and turbidity curtains must not trap one.

Yellow turbidity curtain enclosing a seawall work area on a calm canal

Pile driving stops whenever a manatee comes within 50 ft, so watchers are posted.[5][6]

What makes Miami waterfront work different

Most of Biscayne Bay and its natural tributaries, including the Miami River and Little River, are state-owned submerged lands, so docks over them need the state's consent alongside the DERM permit. The Biscayne Bay Aquatic Preserve is listed by DERM as a permitting contact, and FDEP's free online dock self-certification is not available in aquatic preserves. The federal seagrass range used in dock design reaches central Biscayne Bay.[1][4][7]

Older bayfront seawall with a coral rock face on Biscayne Bay, with high-rises across the water

City of Miami seawall height

In 2020 the City considered an ordinance (File 7338) to set a 6 ft NAVD 88 minimum for new and rebuilt seawalls east of US-1, outside the Miami River. We have not confirmed that it was adopted, so for every Miami seawall job we confirm the current height rule with the City before design.[8]

Private timber dock with a small boat on a calm river lined with mangroves and older waterfront homes

Permits in Miami

  • Miami-Dade DERM, Coastal Resources Section: Class I permit for any work in, on or over tidal water, the Miami River included, with exempt, expedited and short-form routes for small jobs. Phone (305) 372-6575.
  • City of Miami Building Department: Structural and zoning approval for seawalls, docks and lifts inside city limits.
  • Florida DEP or South Florida Water Management District: State permit or exemption, and consent to use the state-owned bottom of Biscayne Bay, the Miami River and Little River, which DERM grants for most of the bay on the state's behalf.
  • US Army Corps of Engineers, Jacksonville District: Federal sign-off for work in the bay and the river. SPGP VI, the small-project route, passed its stated 27 July 2026 expiry, so we confirm the current route for each job.

Rules that shape pile work

Under SPGP VI, impact-hammer installation of metal pipe or metal sheet piles was not authorised, so steel piles needed a separate federal review. All in-water work stops when a manatee comes within 50 ft and restarts once it has moved beyond 50 ft or 30 minutes pass without it reappearing; project vessels run at idle speed and no wake.[7][6]

Timber dock pilings with plastic wraps beside an older unwrapped piling with barnacles
Piling costs
ItemFigureSource and scope
Replacing an individual piling$300 to $1,600Fixr, national, 2025
Source: Fixr.com (secondary national cost guide), Cost to Build a Dock (updated 31 Jan 2025). Last updated October 28, 2026.

Frequently asked questions

Can I remove an old dock in Miami without a permit?

DERM exempts removal of old piles and dilapidated docks, lifts and davits. A City demolition or building permit may still apply, so we check before work starts.

Is a dock on Biscayne Bay in Miami treated differently from one on a canal?

Yes. The bay is an aquatic preserve and Outstanding Florida Waters, so the state exemption allows 500 sq ft over the water there, compared with 1,000 sq ft on an artificial canal, and FDEP's free online self-certification is not available.

Do manatee rules affect marine work in Miami?

Yes. Miami-Dade manatee zones (rule 68C-22.025) set boat speeds, and the state conditions stop all in-water work while a manatee is within 50 ft.

Sources

  1. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  2. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  3. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  4. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  5. Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
  6. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  7. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  8. City of Miami File ID 7338 (Revision A): Ordinance amending Chapters 20, 29 and 54 to set seawall minimum heights (Second Reading, printed 5/19/2020), City of Miami. Accessed October 27, 2026.
  9. Letter to the Miami City Manager on Community Rating System verification (12 May 2022), with CRS verification report, FEMA, Federal Insurance and Mitigation Administration (hosted by the City of Miami). Accessed October 28, 2026.
  10. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  11. Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.