SoFlo Marine Construction

Marine construction in Key Largo

Marine construction for Key Largo homes, on non-leaching or sleeved piles, as Monroe County requires.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

Barge-based marine construction for homes, HOAs and small commercial waterfronts: pilings, bulkheads, davits and nature-based shorelines.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Key Largo dock pilings must be recycled plastic, concrete or wrapped in a 30 mil sleeve from below the bottom to 2 ft above high water. Floating docks and lifts in Key Largo need 4 ft of water at mean low water and must stay off seagrass and out of manatee zones.

Last updated

No leaching piles

Every dock piling in unincorporated Monroe County must be non-CCA-leaching, such as recycled plastic or concrete, or be wrapped in an impermeable sleeve at least 30 mil thick from 6 in below the bottom to 2 ft above mean high water. That changes the piling order before a Key Largo job starts.

Wooden dock over clear shallow water and seagrass beside a red mangrove shoreline in the Florida Keys
Illustration: wooden dock over clear shallow water and seagrass beside a red mangrove shoreline in the Florida Keys.

Piling rules apply to every structure we drive into the bottom.[1]

Floating lifts and docks need deep water

Floats are allowed in Key Largo only over water at least 4 ft deep at mean low water. Floating lifts and vessel platforms must also stay off benthic resources and out of manatee zones, be secured to a fixed dock, and keep the whole structure within 25% of the navigable width.

Grass beds decide where barges can anchor and where piles can go.[1]

The Sanctuary starts at high water

The shoreward boundary of the Florida Keys National Marine Sanctuary is the mean high water mark, so once work steps into Key Largo's water it is inside the Sanctuary. Monroe County lists boating restricted areas under rule 68D-24.144, and County approvals wait on state and federal permits before a Notice to Proceed.

Barge crane with vertical leads and a pile hammer driving a square concrete pile beside a dock in a residential canal

Marine construction is mostly in-water work, so the manatee rules set daily routines.[2][3][1]

Where a seawall is allowed at all

Monroe County allows vertical seawalls only to stabilise severely eroding shorelines on man-made canals, channels or basins, and never on open water. Lawfully existing walls may be repaired or replaced on the same footprint, the yard behind must sit at least 6 in below the top of the wall, and riprap goes at the toe wherever feasible.

Shoreline stabilisation follows that rock rule.[1]

What makes Key Largo different

The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[4]

Weathered seawall with riprap at its toe on a clear Keys canal below a stilt home

Sanctuary, seagrass and manatees

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[5][6]

Narrow elevated pier over shallow seagrass with a small terminal platform at the end in deeper water

Permits for marine construction in Key Largo

  • Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
  • Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
  • US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.

What is a marine contractor?

A marine contractor builds structures in, on or over the water: seawalls, bulkheads, docks, pilings and davits. In Florida, specialty contractors' scope is limited to a particular phase of construction, while a general contractor's scope is unlimited as to work requiring licensure under chapter 489. Always check a contractor's licence category on the DBPR licence search before you sign.[8][9]

Permits for work in the water

Most work needs a county environmental permit (in Miami-Dade, a DERM Class I permit), a city building permit, a state decision from FDEP or SFWMD and, where it applies, federal authorisation from the Army Corps of Engineers. Permits attach the state's manatee conditions to all in-water work.[10][11][6]

Yellow turbidity curtain enclosing a seawall work area on a calm canal

Frequently asked questions

What pilings can I use in Key Largo?

Non-CCA-leaching piles such as recycled plastic or concrete, or treated piles wrapped in a sleeve of at least 30 mil from 6 in below the bottom to 2 ft above mean high water.

Are floating lifts allowed in Key Largo?

Yes, in at least 4 ft of water at mean low water, not over benthic resources or in manatee zones, attached to a fixed dock and within 25% of the navigable width.

Is my Key Largo canal inside the marine sanctuary?

Yes. The Sanctuary's shoreward boundary is the mean high water mark, so in-water work is inside it and needs the matching state and federal approvals.

Can I build a new seawall in Key Largo?

Only on a man-made canal, channel or basin to stop severe erosion, and only if plants or riprap will not work. Existing lawful walls can be repaired or replaced on the same footprint.

Sources

  1. Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
  2. Florida Keys National Marine Sanctuary, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  3. Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
  4. Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
  5. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  6. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  7. Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
  8. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  9. Florida Statutes 2026, Section 489.105 Definitions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  10. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  11. Environmental Resource Permitting: Coordination, Assistance, Portals, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.