SoFlo Marine Construction

Marine construction in Boca Raton

Marine construction in Boca Raton, where crews follow Palm Beach County manatee zones.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

Barge-based marine construction for homes, HOAs and small commercial waterfronts: pilings, bulkheads, davits and nature-based shorelines.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Marine construction covers work built in or over the water, such as pilings, bulkheads, davits and shorelines. Boca Raton work follows Palm Beach County's manatee zones (rule 68C-22.009) and sits inside the federal Johnson's seagrass range.

Last updated

Palm Beach County manatee zones

Boca Raton waters fall under Palm Beach County's manatee protection zones in state rule 68C-22.009, with boating restricted areas in 68D-24.017 and 68D-24.011. The federal Johnson's seagrass range used for dock design also covers these waters, so pile and dock layouts avoid grass beds.

Mediterranean-style waterfront homes with seawalls, docks and boats on lifts along the Intracoastal Waterway
Illustration: mediterranean-style waterfront homes with seawalls, docks and boats on lifts along the Intracoastal Waterway.

Marine construction is mostly in-water work, so the manatee rules set daily routines.[1][2]

Signed lift drawings with pile details

Palm Beach County classes docks, seawalls, boat lifts and boathouses as Type 8 marine structure permits, and its checklist asks for signed and sealed boat lift drawings with pile details and the manufacturer's specifications. Boca Raton's own Chapter 22 review expects the same level of detail before a lift goes in.

Barge crane with vertical leads and a pile hammer driving a square concrete pile beside a dock in a residential canal

Piling rules apply to every structure we drive into the bottom.[3][4]

What makes Boca Raton different

Plan review needs a current-conditions survey showing the seawall wet face or bulkhead line, the property line and piles, section details with the finished cap elevation, and a proposed site plan. Inspections are staged: a location survey before the cap is poured and before the structural cap and piling inspections, a final engineer report on cap elevation with photos, and a final marine structure survey for docks and lifts.[4]

White seawall and narrow dock on the Intracoastal below Mediterranean homes with barrel tile roofs

Agencies beyond the City

Palm Beach County's marine structure checklist for unincorporated areas lists the outside approvals agencies expect to see: FDEP, the Florida Inland Navigation District (FIND) and the Army Corps, as applicable. That checklist is dated 2005, so we confirm current requirements for each job. The federal seagrass range used in dock design covers Palm Beach County waters.[3][2]

Boat on a seawall-mounted elevator lift at a waterfront home with the Intracoastal beyond

Permits for marine construction in Boca Raton

  • City of Boca Raton Development Services: Marine structure permits under City Code Chapter 22, with staged survey and engineer inspections.
  • Florida Inland Navigation District (FIND): May be involved for work along the Intracoastal Waterway.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks, walls and lifts on Lake Boca Raton and the Intracoastal Waterway.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation along the Intracoastal, which the Palm Beach County checklist expects to see with the building permit.

What is a marine contractor?

A marine contractor builds structures in, on or over the water: seawalls, bulkheads, docks, pilings and davits. In Florida, specialty contractors' scope is limited to a particular phase of construction, while a general contractor's scope is unlimited as to work requiring licensure under chapter 489. Always check a contractor's licence category on the DBPR licence search before you sign.[7][8]

Permits for work in the water

Most work needs a county environmental permit (in Miami-Dade, a DERM Class I permit), a city building permit, a state decision from FDEP or SFWMD and, where it applies, federal authorisation from the Army Corps of Engineers. Permits attach the state's manatee conditions to all in-water work.[9][10][11]

Yellow turbidity curtain enclosing a seawall work area on a calm canal

Frequently asked questions

Do seagrass and manatee rules affect docks in Boca Raton?

Yes. Palm Beach County manatee zones (rule 68C-22.009) apply, and Boca is inside the federal Johnson's seagrass range used to review docks over grass.

What drawings does a boat lift need in Boca Raton?

Signed and sealed lift drawings with pile details and the manufacturer's specifications, as the Palm Beach County Type 8 checklist lists.

Sources

  1. Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
  2. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  3. TYPE 8 Marine Structures (Dock, Seawall, Boatlift, Boathouse) Application Submittal Checklist, Palm Beach County Planning, Zoning and Building. Accessed October 27, 2026.
  4. Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.
  5. Engineering Design Standards Manual, section 7.7 Minimum Criteria for Waterway Features (PDF modified 10 Apr 2025), City of Boca Raton. Accessed October 28, 2026.
  6. Insure Your Property, City of Boca Raton. Accessed October 28, 2026.
  7. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  8. Florida Statutes 2026, Section 489.105 Definitions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  9. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  10. Environmental Resource Permitting: Coordination, Assistance, Portals, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  11. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.