SoFlo Marine Construction

Bulkheads in Boca Raton

Bulkheads for Boca Raton homes, set inside the City's 4.0 to 6.0 ft NAVD88 height band.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We build, repair and replace bulkheads on canals, lakes connected to tidal water and the Intracoastal, with engineered drawings and permits.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Boca Raton sets new or replaced seawalls and docks between 4.0 and 6.0 ft NAVD88, a maximum as well as a minimum. Boca Raton asks for new seawalls designed to take another 12 to 18 in of height later without alteration.

Last updated

Who this is for

Owners and associations with a bulkhead that leaks, leans or sits below the local height standard.

A height band, not just a minimum

Boca Raton's Engineering Design Standards Manual sets any new or replaced seawall or dock between 4.0 ft and 6.0 ft NAVD88. The maximum is unusual among the cities we work in: a wall or dock cannot simply be built as high as the owner likes.

Mediterranean-style waterfront homes with seawalls, docks and boats on lifts along the Intracoastal Waterway
Illustration: mediterranean-style waterfront homes with seawalls, docks and boats on lifts along the Intracoastal Waterway.

Bulkheads meet the same height rule as seawalls.[1]

Designed for 12 to 18 more inches

The same manual asks for seawalls designed to take an added 12 to 18 in of height later without alteration. That sizes the piles, panels and tiebacks today for a raise the owner may only pay for in ten or twenty years.

Repairing an old bulkhead can trigger the full height rule, so we check first.[1]

A survey before the cap is poured

Boca Raton will not let a seawall cap be poured until a ZON location survey is approved, and after the work an engineer reports the finished cap elevation with photos. Docks and lifts finish with a Final Marine Structure Survey, so the elevation band is checked in the field, not just on paper.

Freshly poured smooth concrete seawall cap with timber formwork along the edge

Bulkheads follow the seawall permit route.[2]

What makes Boca Raton different

Plan review needs a current-conditions survey showing the seawall wet face or bulkhead line, the property line and piles, section details with the finished cap elevation, and a proposed site plan. Inspections are staged: a location survey before the cap is poured and before the structural cap and piling inspections, a final engineer report on cap elevation with photos, and a final marine structure survey for docks and lifts.[2]

White seawall and narrow dock on the Intracoastal below Mediterranean homes with barrel tile roofs

Agencies beyond the City

Palm Beach County's marine structure checklist for unincorporated areas lists the outside approvals agencies expect to see: FDEP, the Florida Inland Navigation District (FIND) and the Army Corps, as applicable. That checklist is dated 2005, so we confirm current requirements for each job. The federal seagrass range used in dock design covers Palm Beach County waters.[3][4]

Boat on a seawall-mounted elevator lift at a waterfront home with the Intracoastal beyond

Permits in Boca Raton

  • City of Boca Raton Development Services: Marine structure permits under City Code Chapter 22, with staged survey and engineer inspections.
  • Florida Inland Navigation District (FIND): May be involved for work along the Intracoastal Waterway.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks, walls and lifts on Lake Boca Raton and the Intracoastal Waterway.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation along the Intracoastal, which the Palm Beach County checklist expects to see with the building permit.

Where state exemptions stop

Florida exempts restoring a seawall at its previous location or within 18 inches waterward, and allows seawalls in artificial waterways. The exemption does not cover new vertical seawalls in estuaries or lagoons unless they sit inside an existing manmade canal already lined with seawalls.[8]

Trench behind a seawall exposing a steel tie rod running back to a concrete anchor

Frequently asked questions

How high can a seawall or dock be in Boca Raton?

Between 4.0 ft and 6.0 ft NAVD88 for new or replaced seawalls and docks, under section 7.7 of the City's Engineering Design Standards Manual.

Does a new seawall in Boca Raton have to allow for raising later?

Yes. Section 7.7 asks for walls designed to take an added 12 to 18 in of height without alteration.

What inspections does a Boca Raton seawall get?

A ZON location survey before the cap is poured and before the structural cap and piling inspections, then a final engineer report on the cap elevation with photos.

Sources

  1. Engineering Design Standards Manual, section 7.7 Minimum Criteria for Waterway Features (PDF modified 10 Apr 2025), City of Boca Raton. Accessed October 28, 2026.
  2. Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.
  3. TYPE 8 Marine Structures (Dock, Seawall, Boatlift, Boathouse) Application Submittal Checklist, Palm Beach County Planning, Zoning and Building. Accessed October 27, 2026.
  4. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  5. Insure Your Property, City of Boca Raton. Accessed October 28, 2026.
  6. CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
  7. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  8. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.