SoFlo Marine Construction

Marine construction in Fort Lauderdale

Marine construction for Fort Lauderdale homes, started only once the Broward County license is in hand.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

Barge-based marine construction for homes, HOAs and small commercial waterfronts: pilings, bulkheads, davits and nature-based shorelines.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Any Fort Lauderdale dock, piling or seawall work in the water needs a Broward County license before it starts. Fort Lauderdale can cite owners whose seawalls let king tide water reach the street, and asks for overtopped walls to be raised to 5 ft.

Last updated

The Broward County license comes first

Broward County requires its own license before any work in, on, over or under county waters, and that includes repairing or replacing a dock or seawall. Pile replacement, lift repairs that touch the pilings and seawall work all need that county license before work starts, on top of the City permit.

Aerial view of finger islands with seawalls, docks and moored yachts along deep canals in Fort Lauderdale
Illustration: aerial view of finger islands with seawalls, docks and moored yachts along deep canals in Fort Lauderdale.

Every in-water job waits for that approval.[1]

King tides and street flooding

The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.

Shoreline stabilisation follows that rock rule.[2][3]

Broward manatee zones

Broward County's manatee protection zones are set in state rule 68C-22.010, with boating restricted areas in 68D-24.008. In-water crews on the Intracoastal and the New River follow the slow-speed zones and stop work whenever a manatee comes within 50 ft.

Barge crane with vertical leads and a pile hammer driving a square concrete pile beside a dock in a residential canal

Marine construction is mostly in-water work, so the manatee rules set daily routines.[4][5]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[3][2]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[1][3]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits for marine construction in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

What is a marine contractor?

A marine contractor builds structures in, on or over the water: seawalls, bulkheads, docks, pilings and davits. In Florida, specialty contractors' scope is limited to a particular phase of construction, while a general contractor's scope is unlimited as to work requiring licensure under chapter 489. Always check a contractor's licence category on the DBPR licence search before you sign.[9][10]

Permits for work in the water

Most work needs a county environmental permit (in Miami-Dade, a DERM Class I permit), a city building permit, a state decision from FDEP or SFWMD and, where it applies, federal authorisation from the Army Corps of Engineers. Permits attach the state's manatee conditions to all in-water work.[11][12][5]

Yellow turbidity curtain enclosing a seawall work area on a calm canal

Frequently asked questions

Do I need a county license to repair my dock in Fort Lauderdale?

Yes. Broward County requires a license before any work in, on, over or under its waters, including repair or replacement of a dock or seawall.

Can Fort Lauderdale make me fix my seawall?

Yes. The City can cite walls that contribute to tidal flooding of the street, and after notice owners have 60 days to show progress and 365 days to finish.

Do manatee rules apply in Fort Lauderdale canals?

Yes. Broward's zones under rule 68C-22.010 set boat speeds, and the state conditions stop in-water work while a manatee is within 50 ft.

Sources

  1. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  2. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  3. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  4. Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
  5. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  6. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  7. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  8. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  9. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  10. Florida Statutes 2026, Section 489.105 Definitions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  11. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  12. Environmental Resource Permitting: Coordination, Assistance, Portals, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.