Miami Beach marine construction scheduled around manatee season in the bay.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

Barge-based marine construction for homes, HOAs and small commercial waterfronts: pilings, bulkheads, davits and nature-based shorelines.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Bay-facing Miami Beach lots sit on the Biscayne Bay Aquatic Preserve, so an exempt dock is limited to 500 sq ft over the water. Miami Beach work follows Miami-Dade's manatee zones (rule 68C-22.025), and winter jobs plan for more 50 ft shutdowns as manatees move into the bay.

Last updated

Manatee season in the bay

Miami Beach waters are inside Miami-Dade's manatee protection zones under rule 68C-22.025, and the aquatic preserve notes manatees moving into the bay for warmer water in cooler months. Winter pile driving and seawall jobs plan for more 50 ft shutdowns and keep turbidity curtains non-entangling.

Aerial view of bay-side canal homes with seawalls, docks and boat lifts, with the Miami skyline across Biscayne Bay
Illustration: aerial view of bay-side canal homes with seawalls, docks and boat lifts, with the Miami skyline across Biscayne Bay.

Marine construction is mostly in-water work, so the manatee rules set daily routines.[1][2][3]

Bay-side lots and the aquatic preserve

Lots that face open Biscayne Bay rather than a dredged canal sit on the Biscayne Bay Aquatic Preserve, which counts as Outstanding Florida Waters. There the state dock exemption is 500 sq ft of over-water area, and the preserve says manatees move into the bay in the cooler months.

Barge crane with vertical leads and a pile hammer driving a square concrete pile beside a dock in a residential canal

Grass beds decide where barges can anchor and where piles can go.[2][4][5]

What makes Miami Beach different

The city has about 55 miles of seawall, of which only about 5 miles are publicly owned, so most of it is the responsibility of private owners. Its seawall ordinance dates from Resolution R2016-4009 in May 2016, was strengthened in January 2021 and amended again in July 2025.[6][8]

Two neighbouring seawalls of different heights on a bay-side island canal, one with a new taller cap

Groundwater and flooding

The city notes that groundwater rises through the porous bedrock under Miami Beach, so a seawall alone cannot stop flooding. A raised wall stops tidal overtopping; drainage and flood protection handle the rest.[9]

Two boats on four-post lifts behind modern homes on a narrow canal with clean seawall caps

Permits for marine construction in Miami Beach

  • City of Miami Beach Building Department: Building permit with a site plan, structural plans and an elevation certification.
  • Miami-Dade DERM, Coastal Resources Section: Class I permit or exemption for seawalls, docks and lifts on the island canals and the bay, issued alongside the City permit. Phone (305) 372-6575.
  • Florida DEP or South Florida Water Management District: State review where a dock or wall reaches open Biscayne Bay, part of the aquatic preserve, where FDEP's free online self-certification is not available.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in Biscayne Bay and Indian Creek; we confirm the small-project route since SPGP VI's stated July 2026 expiry.

What is a marine contractor?

A marine contractor builds structures in, on or over the water: seawalls, bulkheads, docks, pilings and davits. In Florida, specialty contractors' scope is limited to a particular phase of construction, while a general contractor's scope is unlimited as to work requiring licensure under chapter 489. Always check a contractor's licence category on the DBPR licence search before you sign.[12][13]

Permits for work in the water

Most work needs a county environmental permit (in Miami-Dade, a DERM Class I permit), a city building permit, a state decision from FDEP or SFWMD and, where it applies, federal authorisation from the Army Corps of Engineers. Permits attach the state's manatee conditions to all in-water work.[10][14][3]

Yellow turbidity curtain enclosing a seawall work area on a calm canal

Frequently asked questions

Does winter change marine work in Miami Beach?

It can. Manatees move into Biscayne Bay in the cooler months, and work stops whenever one comes within 50 ft, so winter schedules allow for pauses.

Does the aquatic preserve affect my Miami Beach dock?

If the dock is on open Biscayne Bay rather than a dredged canal, yes: the exemption limit is 500 sq ft of over-water area and FDEP's free self-certification is not available.

Sources

  1. Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
  2. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  3. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  4. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  5. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  6. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  7. Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  8. Seawalls (Public Infrastructure), City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  9. Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
  10. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  11. Press release: Miami Beach Receives Improved Class 5 Rating from FEMA (3 April 2019), City of Miami Beach, Department of Marketing and Communications. Accessed October 28, 2026.
  12. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  13. Florida Statutes 2026, Section 489.105 Definitions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  14. Environmental Resource Permitting: Coordination, Assistance, Portals, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.