Docks in Coral Gables
Dock building and repair to Coral Gables' submittal rules.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
New fixed and floating docks, repairs, pile replacement and composite decking, designed around your boat, your water depth and the permit limits for your waterway.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
In Coral Gables, dock, mooring and wharf plans must show dimensions across the waterway and any existing mangroves, and must carry Miami-Dade DERM's preliminary approval before the City looks at them (City of Coral Gables, 2026). Properties in Cocoplum Section II must also include a copy of the Cocoplum dock plan.
Last updated
Typical project sizes
Fixr's 2025 national guide puts most docks at $7,000 to $25,000 and piling docks at $20 to $40 per square foot installed. Long Keys docks that need a length exception, or docks in aquatic preserves, cost more to permit.
What the City wants to see
A notarised Public Works permit application, plans with dimensions across the waterway, existing mangroves and the installation method, colour photos of existing conditions and a survey. Revised plans need DERM's stamp again.[1]
Mangroves
Where a dock affects mangroves, DERM's mangrove permits are valid for 3 years, and the Class I application covers mangrove trimming.[2]
The bay off the Gables is preserve water
The Biscayne Bay Aquatic Preserve runs the length of the bay outside Biscayne National Park, and its access list includes the Matheson Hammock Park boat ramp beside the Gables bayfront. Bay-facing docks there fall under the 500 sq ft Outstanding Florida Waters exemption and the preserve's seagrass protection, while Miami-Dade manatee zones (rule 68C-22.025) govern boat speeds.

Grass and hard bottom decide where the dock can go and how high it sits.[3][4][5]
What makes Coral Gables different
Dock, mooring and wharf plans must show dimensions across the waterway, existing mangroves and the installation method, and carry DERM's preliminary approval; revised plans need a DERM stamp again. Properties in Cocoplum Section II must include a copy of the Cocoplum dock plan. The City also asks for a notarised Public Works permit application, colour photos of existing conditions and a survey.[1]

Fee incentives
Under Resolution 2025-342, living seawalls with pH-neutral cement or modular retrofit panels qualify for a 20% reduction in city permit fees, and a separate fee waiver applies to existing homes making seawall improvements to address sea level rise.[7]

Permits for docks in Coral Gables
- Miami-Dade DERM, Coastal Resources Section: Class I permit, plus the preliminary approval the City asks to see before it looks at any dock or wall plans. Phone (305) 372-6575.
- City of Coral Gables Development Services and Public Works: Building and Public Works permits for seawalls, bulkheads and docks, after DERM preliminary approval.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the Gables canals and the bay, where aquatic preserve rules apply to open bay frontage.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for bayfront and canal work, confirmed for each job since SPGP VI's stated July 2026 expiry.
How big can my dock be?
It depends on where you are. Florida's statutory exemption covers private docks up to 1,000 sq ft of over-water area, or 500 sq ft in Outstanding Florida Waters, with one exempt dock per 65 ft of shoreline. Over-water area includes roofs, boat canopies, elevated platforms and decking. In Miami-Dade a single-family dock on the short-form permit may not protrude more than 25% of the waterway width.[4][11][2]

Docks over state-owned water
Most of Biscayne Bay and its natural tributaries, including the Miami River, Little River, Oleta River and Arch Creek, are state-owned submerged lands. A dock there needs the state's consent, which DERM can grant on the state's behalf for qualifying projects. FDEP requires structures to sit at least 25 ft inside riparian lines (10 ft for marginal docks), with exceptions.[2][11]

| Item | Figure | Source and scope |
|---|---|---|
| Dock, built | $7,000 to $25,000, average $15,000 | Fixr, national, 2025 |
| Piling dock | $20 to $40 per sq ft installed | Fixr, national, 2025 |
| Replacing a piling | $300 to $1,600 each | Fixr, national, 2025 |
| FDEP exemption verification | $100 | FDEP, current |
| FDEP general permit | $250 | FDEP, current |
| FDEP individual permit | $420 | FDEP, current |
Docks services in Coral Gables
Dock construction in Coral Gables
New fixed docks on pilings, designed to your boat and your permit limits.
Dock repair in Coral Gables
Board, rail, framing and piling repairs on fixed docks.
Floating docks in Coral Gables
Floating docks and gangways that rise and fall with the tide.
Dock pilings in Coral Gables
Piling replacement, new pilings, wraps and caps.
Composite dock decking in Coral Gables
Composite and other low-maintenance decking for new and existing docks.
Frequently asked questions
Does Cocoplum have its own dock rules?
Properties in Cocoplum Section II must submit a copy of the Cocoplum dock plan with the permit.
Which comes first, DERM or the City?
DERM. The City needs DERM's preliminary approval on the plans before it looks at them.
Sources
- Permit Requirements for Development Services (rev. 07.22.2026), section Docks/Moorings/Wharves, City of Coral Gables Development Services Department. Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
- CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
- Solar, Open Air Dining, and Other Permits, City of Coral Gables. Accessed October 27, 2026.
- Datums for station 8723289, Cutler, Biscayne Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723170, Miami Harbor Entrance (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
