SoFlo Marine Construction

Docks in Miami Beach

Dock building and repair on Miami Beach canals and the bay.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

New fixed and floating docks, repairs, pile replacement and composite decking, designed around your boat, your water depth and the permit limits for your waterway.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

A new dock in Miami Beach needs a City of Miami Beach building permit and Miami-Dade DERM Coastal Resources approval, plus FDEP and Army Corps approval where they apply (City of Miami Beach, 2025). Because so many docks are attached to private seawalls, dock work is the right moment to check the wall against the 5.7 ft NAVD standard.

Last updated

Typical project sizes

Fixr's 2025 national guide puts most docks at $7,000 to $25,000 and piling docks at $20 to $40 per square foot installed. Long Keys docks that need a length exception, or docks in aquatic preserves, cost more to permit.

Docks and the seawall behind them

About 50 of the city's roughly 55 miles of seawall are privately owned, so most docks sit on a private wall. If the dock project includes seawall work costing $300 or more per linear foot, that work must meet 5.7 ft NAVD.[1]

Modern private dock and boat lift at a bayfront home with the city skyline faint across the water
Illustration: modern private dock and boat lift at a bayfront home with the city skyline faint across the water.

Bay bottom and neighbours

Biscayne Bay is mostly state-owned submerged land, and DERM can grant the state's consent for qualifying docks. DERM's D-5 boundary protects neighbours' views and access and can call for consent letters.[2]

Bay-side lots and the aquatic preserve

Lots that face open Biscayne Bay rather than a dredged canal sit on the Biscayne Bay Aquatic Preserve, which counts as Outstanding Florida Waters. There the state dock exemption is 500 sq ft of over-water area, and the preserve says manatees move into the bay in the cooler months.

New dock framing of pressure-treated joists and stringers bolted to pilings over a canal

Grass and hard bottom decide where the dock can go and how high it sits.[3][4][5]

Tide at Government Cut

NOAA's Miami Harbor Entrance gauge at Government Cut, beside South Beach, shows a 2.46 ft mean range and a 2.70 ft great diurnal range, with mean higher high water about 0.33 ft above NAVD 88 (1983 to 2001 epoch). A wall at 5.7 ft NAVD therefore stands roughly 5.4 ft above an average high tide, the margin the City wants for king tides and sea level rise.

The tide sets the deck height and how far a boat rises against the dock.[6]

What makes Miami Beach different

The city has about 55 miles of seawall, of which only about 5 miles are publicly owned, so most of it is the responsibility of private owners. Its seawall ordinance dates from Resolution R2016-4009 in May 2016, was strengthened in January 2021 and amended again in July 2025.[1][8]

Two neighbouring seawalls of different heights on a bay-side island canal, one with a new taller cap

Groundwater and flooding

The city notes that groundwater rises through the porous bedrock under Miami Beach, so a seawall alone cannot stop flooding. A raised wall stops tidal overtopping; drainage and flood protection handle the rest.[9]

Two boats on four-post lifts behind modern homes on a narrow canal with clean seawall caps

Permits for docks in Miami Beach

  • City of Miami Beach Building Department: Building permit with a site plan, structural plans and an elevation certification.
  • Miami-Dade DERM, Coastal Resources Section: Class I permit or exemption for seawalls, docks and lifts on the island canals and the bay, issued alongside the City permit. Phone (305) 372-6575.
  • Florida DEP or South Florida Water Management District: State review where a dock or wall reaches open Biscayne Bay, part of the aquatic preserve, where FDEP's free online self-certification is not available.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in Biscayne Bay and Indian Creek; we confirm the small-project route since SPGP VI's stated July 2026 expiry.

How big can my dock be?

It depends on where you are. Florida's statutory exemption covers private docks up to 1,000 sq ft of over-water area, or 500 sq ft in Outstanding Florida Waters, with one exempt dock per 65 ft of shoreline. Over-water area includes roofs, boat canopies, elevated platforms and decking. In Miami-Dade a single-family dock on the short-form permit may not protrude more than 25% of the waterway width.[4][5][2]

Overhead view of a canal-front lot with a seawall and small dock, showing the canal width and neighbouring docks

Docks over state-owned water

Most of Biscayne Bay and its natural tributaries, including the Miami River, Little River, Oleta River and Arch Creek, are state-owned submerged lands. A dock there needs the state's consent, which DERM can grant on the state's behalf for qualifying projects. FDEP requires structures to sit at least 25 ft inside riparian lines (10 ft for marginal docks), with exceptions.[2][5]

Healthy seagrass bed on a sandy bottom in clear shallow water next to mangrove roots
Dock costs and permit fees
ItemFigureSource and scope
Dock, built$7,000 to $25,000, average $15,000Fixr, national, 2025
Piling dock$20 to $40 per sq ft installedFixr, national, 2025
Replacing a piling$300 to $1,600 eachFixr, national, 2025
FDEP exemption verification$100FDEP, current
FDEP general permit$250FDEP, current
FDEP individual permit$420FDEP, current
Fixr figures are national industry estimates, not South Florida quotes. Sources: Florida Department of Environmental Protection (FDEP), Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria; Fixr.com (secondary national cost guide), Cost to Build a Dock (updated 31 Jan 2025). Last updated October 28, 2026.

Frequently asked questions

Who permits docks in Miami Beach?

The City of Miami Beach Building Department and Miami-Dade DERM, with FDEP and the Army Corps where they apply.

Should I fix my seawall before building a dock?

Often, yes. Rebuilding a dock on a wall that will soon need raising means paying twice.

Sources

  1. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  2. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  3. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  4. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  5. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  6. Datums for station 8723170, Miami Harbor Entrance (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  7. Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  8. Seawalls (Public Infrastructure), City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  9. Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
  10. Press release: Miami Beach Receives Improved Class 5 Rating from FEMA (3 April 2019), City of Miami Beach, Department of Marketing and Communications. Accessed October 28, 2026.
  11. Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.