Docks in Key Largo
Docks on Key Largo canals, Blackwater Sound and the bay side.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
New fixed and floating docks, repairs, pile replacement and composite decking, designed around your boat, your water depth and the permit limits for your waterway.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Dock length in Key Largo is limited by Monroe County Code section 118-12(m)(15), and a longer dock needs a Dock Length Special Exception costing $1,450 plus $3 per shoreline owner within 300 ft (Monroe County, 2026). Projects inside the Florida Keys National Marine Sanctuary also need Sanctuary approval.
Last updated
Typical project sizes
Fixr's 2025 national guide puts most docks at $7,000 to $25,000 and piling docks at $20 to $40 per square foot installed. Long Keys docks that need a length exception, or docks in aquatic preserves, cost more to permit.
Shallow water and seagrass
The special exception application asks what the dock crosses, such as sand, seagrass or coral, and the minimum relaxation needed to reach adequate water depth. Over seagrass, docks follow federal minor piling-supported structure guidelines.[1][2]
Who draws the site plan
The site plan must be by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[1]
10% of the water, 25% with the boat
Monroe County Code 118-12(m) keeps a Key Largo dock to 10% of the waterbody width, measured mean low water to mean low water, and the dock together with the moored boat and any lift to 25% of the navigable width. On a 50 ft canal that is a 5 ft dock.

That limit sets the size of the dock before any material choice.[3]
Pier docks: 4 ft wide, 100 ft long
Pier docks in unincorporated Monroe County may be no wider than 4 ft and no longer than twice the lot's shoreline frontage or 100 ft, whichever is less. Reaching deeper water takes a Dock Length Special Exception, which costs $1,450 plus $3 per shoreline owner within 300 ft.
We prepare the drawings and surveys that permit path asks for.[3][1]
What makes Key Largo different
The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[1]

Sanctuary, seagrass and manatees
Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[2][4]

Permits for docks in Key Largo
- Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
- Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
- Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
- US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.
How big can my dock be?
It depends on where you are. Florida's statutory exemption covers private docks up to 1,000 sq ft of over-water area, or 500 sq ft in Outstanding Florida Waters, with one exempt dock per 65 ft of shoreline. Over-water area includes roofs, boat canopies, elevated platforms and decking. In Miami-Dade a single-family dock on the short-form permit may not protrude more than 25% of the waterway width.[7][8][9]

Docks over state-owned water
Most of Biscayne Bay and its natural tributaries, including the Miami River, Little River, Oleta River and Arch Creek, are state-owned submerged lands. A dock there needs the state's consent, which DERM can grant on the state's behalf for qualifying projects. FDEP requires structures to sit at least 25 ft inside riparian lines (10 ft for marginal docks), with exceptions.[9][8]

| Item | Figure | Source and scope |
|---|---|---|
| Dock, built | $7,000 to $25,000, average $15,000 | Fixr, national, 2025 |
| Piling dock | $20 to $40 per sq ft installed | Fixr, national, 2025 |
| Replacing a piling | $300 to $1,600 each | Fixr, national, 2025 |
| FDEP exemption verification | $100 | FDEP, current |
| FDEP general permit | $250 | FDEP, current |
| FDEP individual permit | $420 | FDEP, current |
Docks services in Key Largo
Dock construction in Key Largo
New fixed docks on pilings, designed to your boat and your permit limits.
Dock repair in Key Largo
Board, rail, framing and piling repairs on fixed docks.
Floating docks in Key Largo
Floating docks and gangways that rise and fall with the tide.
Dock pilings in Key Largo
Piling replacement, new pilings, wraps and caps.
Composite dock decking in Key Largo
Composite and other low-maintenance decking for new and existing docks.
Frequently asked questions
Why do Keys docks need to be long?
Shallow nearshore water. The county lets owners ask for extra length only as far as needed to reach adequate depth.
Sources
- Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
- Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
