The short answer

A single-family dock in Miami that protrudes no more than 25% of the waterway width is a short-form DERM permit approved by staff, and most docks on Biscayne Bay or the Miami River also need the state's consent for the submerged land beneath them, which DERM can grant (Miami-Dade DERM, 2025).

Last updated

Typical project sizes

Fixr's 2025 national guide puts most docks at $7,000 to $25,000 and piling docks at $20 to $40 per square foot installed. Long Keys docks that need a length exception, or docks in aquatic preserves, cost more to permit.

Docks over Biscayne Bay

Biscayne Bay, the Miami River and Little River are state-owned submerged lands. In the Biscayne Bay Aquatic Preserve, FDEP's free online exemption self-certification is not available and single-family docks are limited to a 4 ft walkway, a 160 sq ft terminal platform and no more than 500 ft or 20% of the waterbody width.[1][2]

Neighbours and the D-5 boundary

DERM's D-5 boundary protects neighbours' view and access. A Miami dock that reaches beyond it may need consent letters from adjacent owners.[1]

Bayfront lots sit on Outstanding Florida Waters

The Biscayne Bay Aquatic Preserve covers 64,607 acres from the Oleta River to Card Sound and is treated as Outstanding Florida Waters. On open bay frontage that halves the state dock exemption to 500 sq ft of over-water area, against 1,000 sq ft on an artificial canal, and seagrass damage in the preserve can bring a fine of up to $1,000.

New dock framing of pressure-treated joists and stringers bolted to pilings over a canal

Grass and hard bottom decide where the dock can go and how high it sits.[3][4][2]

What makes Miami waterfront work different

Most of Biscayne Bay and its natural tributaries, including the Miami River and Little River, are state-owned submerged lands, so docks over them need the state's consent alongside the DERM permit. The Biscayne Bay Aquatic Preserve is listed by DERM as a permitting contact, and FDEP's free online dock self-certification is not available in aquatic preserves. The federal seagrass range used in dock design reaches central Biscayne Bay.[1][2][5]

Older bayfront seawall with a coral rock face on Biscayne Bay, with high-rises across the water

City of Miami seawall height

In 2020 the City considered an ordinance (File 7338) to set a 6 ft NAVD 88 minimum for new and rebuilt seawalls east of US-1, outside the Miami River. We have not confirmed that it was adopted, so for every Miami seawall job we confirm the current height rule with the City before design.[6]

Private timber dock with a small boat on a calm river lined with mangroves and older waterfront homes

Permits for docks in Miami

  • Miami-Dade DERM, Coastal Resources Section: Class I permit for any work in, on or over tidal water, the Miami River included, with exempt, expedited and short-form routes for small jobs. Phone (305) 372-6575.
  • City of Miami Building Department: Structural and zoning approval for seawalls, docks and lifts inside city limits.
  • Florida DEP or South Florida Water Management District: State permit or exemption, and consent to use the state-owned bottom of Biscayne Bay, the Miami River and Little River, which DERM grants for most of the bay on the state's behalf.
  • US Army Corps of Engineers, Jacksonville District: Federal sign-off for work in the bay and the river. SPGP VI, the small-project route, passed its stated 27 July 2026 expiry, so we confirm the current route for each job.

How big can my dock be?

It depends on where you are. Florida's statutory exemption covers private docks up to 1,000 sq ft of over-water area, or 500 sq ft in Outstanding Florida Waters, with one exempt dock per 65 ft of shoreline. Over-water area includes roofs, boat canopies, elevated platforms and decking. In Miami-Dade a single-family dock on the short-form permit may not protrude more than 25% of the waterway width.[4][2][1]

Overhead view of a canal-front lot with a seawall and small dock, showing the canal width and neighbouring docks

Docks over state-owned water

Most of Biscayne Bay and its natural tributaries, including the Miami River, Little River, Oleta River and Arch Creek, are state-owned submerged lands. A dock there needs the state's consent, which DERM can grant on the state's behalf for qualifying projects. FDEP requires structures to sit at least 25 ft inside riparian lines (10 ft for marginal docks), with exceptions.[1][2]

Healthy seagrass bed on a sandy bottom in clear shallow water next to mangrove roots
Dock costs and permit fees
ItemFigureSource and scope
Dock, built$7,000 to $25,000, average $15,000Fixr, national, 2025
Piling dock$20 to $40 per sq ft installedFixr, national, 2025
Replacing a piling$300 to $1,600 eachFixr, national, 2025
FDEP exemption verification$100FDEP, current
FDEP general permit$250FDEP, current
FDEP individual permit$420FDEP, current
Fixr figures are national industry estimates, not South Florida quotes. Sources: Florida Department of Environmental Protection (FDEP), Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria; Fixr.com (secondary national cost guide), Cost to Build a Dock (updated 31 Jan 2025). Last updated October 28, 2026.

Frequently asked questions

Can I build a dock without a permit in Miami?

No. Even a dock exempt from a state permit needs a DERM Class I permit and City of Miami approval.

How far can my dock go out on Biscayne Bay?

In the aquatic preserve, no more than 500 ft waterward of mean high water or 20% of the waterbody width, whichever is less, and no further than the -4 ft mean low water depth.

Sources

  1. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  2. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  3. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  4. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  5. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  6. City of Miami File ID 7338 (Revision A): Ordinance amending Chapters 20, 29 and 54 to set seawall minimum heights (Second Reading, printed 5/19/2020), City of Miami. Accessed October 27, 2026.
  7. Letter to the Miami City Manager on Community Rating System verification (12 May 2022), with CRS verification report, FEMA, Federal Insurance and Mitigation Administration (hosted by the City of Miami). Accessed October 28, 2026.
  8. Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.