SoFlo Marine Construction

Bulkheads in Coral Gables

Bulkheads for Coral Gables homes, built to the City's 6 ft NGVD wall minimum.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We build, repair and replace bulkheads on canals, lakes connected to tidal water and the Intracoastal, with engineered drawings and permits.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Coral Gables requires seawalls and bulkheads at a minimum of 6 ft NGVD 1929, structurally able to support 7.5 ft. Coral Gables plans must show existing mangroves, and trimming them needs a Miami-Dade Class I mangrove permit.

Last updated

Who this is for

Owners and associations with a bulkhead that leaks, leans or sits below the local height standard.

6 ft NGVD, built to carry 7.5 ft

Zoning Code 3-706(C) sets the minimum top of bulkheads and seawalls in Coral Gables at 6 ft NGVD 1929, and the structure must be able to support a wall of 7.5 ft. The City Attorney's 2022 opinion fixed a drafting error that had named NAVD 1988 instead, which matters because the two datums give different numbers for the same height.

Wide waterway with Mediterranean-revival homes, seawalls, docks, palms and banyan trees at golden hour
Illustration: wide waterway with Mediterranean-revival homes, seawalls, docks, palms and banyan trees at golden hour.

Bulkheads meet the same height rule as seawalls.[1]

Mangroves on the plans

Coral Gables dock and wall plans must show existing mangroves, and any trimming falls under Miami-Dade's Class I permit for coastal construction and mangrove trimming. DERM's mangrove permits run 3 years, against 2 years for a short-form structure permit, so a job that touches mangroves is scheduled differently.

Bulkheads go landward of mangroves where possible.[2][3]

Fee breaks for living seawalls

Under Resolution 2025-342, Coral Gables cuts city permit fees by 20% for living seawalls that use pH-neutral cement or modular retrofit panels, and waives fees for existing homes making seawall improvements to address sea level rise.

Freshly poured smooth concrete seawall cap with timber formwork along the edge

Bulkheads are often paired with riprap at the toe.[4]

What makes Coral Gables different

Dock, mooring and wharf plans must show dimensions across the waterway, existing mangroves and the installation method, and carry DERM's preliminary approval; revised plans need a DERM stamp again. Properties in Cocoplum Section II must include a copy of the Cocoplum dock plan. The City also asks for a notarised Public Works permit application, colour photos of existing conditions and a survey.[2]

Tall seawall on a winding mangrove-lined waterway below a Mediterranean revival home

Fee incentives

Under Resolution 2025-342, living seawalls with pH-neutral cement or modular retrofit panels qualify for a 20% reduction in city permit fees, and a separate fee waiver applies to existing homes making seawall improvements to address sea level rise.[4]

Narrow timber dock reaching through a gap in red mangroves to a deeper channel

Permits in Coral Gables

  • Miami-Dade DERM, Coastal Resources Section: Class I permit, plus the preliminary approval the City asks to see before it looks at any dock or wall plans. Phone (305) 372-6575.
  • City of Coral Gables Development Services and Public Works: Building and Public Works permits for seawalls, bulkheads and docks, after DERM preliminary approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the Gables canals and the bay, where aquatic preserve rules apply to open bay frontage.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for bayfront and canal work, confirmed for each job since SPGP VI's stated July 2026 expiry.

Where state exemptions stop

Florida exempts restoring a seawall at its previous location or within 18 inches waterward, and allows seawalls in artificial waterways. The exemption does not cover new vertical seawalls in estuaries or lagoons unless they sit inside an existing manmade canal already lined with seawalls.[8]

Trench behind a seawall exposing a steel tie rod running back to a concrete anchor

Frequently asked questions

How high must a seawall be in Coral Gables?

At least 6 ft NGVD 1929 under Zoning Code 3-706(C), and designed to support 7.5 ft. The City Attorney confirmed in 2022 that the datum is NGVD 1929, not NAVD 1988.

Can I trim mangroves for a dock in Coral Gables?

Only with a Miami-Dade DERM Class I mangrove permit, and the City's dock plans must show the existing mangroves.

Does Coral Gables give any break on seawall permit fees?

Yes. Living seawalls with pH-neutral cement or retrofit panels get 20% off city permit fees, and existing homes improving a seawall for sea level rise can get a fee waiver.

Sources

  1. CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
  2. Permit Requirements for Development Services (rev. 07.22.2026), section Docks/Moorings/Wharves, City of Coral Gables Development Services Department. Accessed October 27, 2026.
  3. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  4. Solar, Open Air Dining, and Other Permits, City of Coral Gables. Accessed October 27, 2026.
  5. Datums for station 8723289, Cutler, Biscayne Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  6. Datums for station 8723170, Miami Harbor Entrance (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  7. Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
  8. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.