We build, repair and replace bulkheads on canals, lakes connected to tidal water and the Intracoastal, with engineered drawings and permits.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Fort Lauderdale requires 5 ft NAVD88 for new and substantially repaired seawalls, or 4 ft until 2035 if the wall can be raised to 5 ft by 2050. Fort Lauderdale can cite owners whose seawalls let king tide water reach the street, and asks for overtopped walls to be raised to 5 ft.
Last updated
Who this is for
Owners and associations with a bulkhead that leaks, leans or sits below the local height standard.
5 ft NAVD88, with a path to 2050
New and substantially repaired tidal barriers in Fort Lauderdale must reach 5 ft NAVD88. A wall permitted before 1 January 2035 may be built at 4 ft NAVD88 if it is designed to be raised to 5 ft by 1 January 2050, which is how many owners spread the cost.

Bulkheads meet the same height rule as seawalls.[1]
King tides and street flooding
The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.
Repairing an old bulkhead can trigger the full height rule, so we check first.[2][1]
Cap repairs and cap additions, priced
The same City material priced cap spall repair at $60 per cubic foot of epoxy mortar and adding a 12 in cap to an existing wall at $75 to $125 per linear foot (2016 figures). Whether an old wall can carry a taller cap is an engineering question, so a marine or structural engineer checks it first.[3]

What makes Fort Lauderdale different
The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[1][2]

The county layer
Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[4][1]

Permits in Fort Lauderdale
- Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
- City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.
Where state exemptions stop
Florida exempts restoring a seawall at its previous location or within 18 inches waterward, and allows seawalls in artificial waterways. The exemption does not cover new vertical seawalls in estuaries or lagoons unless they sit inside an existing manmade canal already lined with seawalls.[10]

Frequently asked questions
How high does a seawall need to be in Fort Lauderdale?
5 ft NAVD88 for new and substantially repaired walls. Walls permitted before 1 January 2035 can be 4 ft if designed to be raised to 5 ft by 1 January 2050.
Can Fort Lauderdale make me fix my seawall?
Yes. The City can cite walls that contribute to tidal flooding of the street, and after notice owners have 60 days to show progress and 365 days to finish.
Can I just add a cap to reach 5 ft in Fort Lauderdale?
Often, if an engineer confirms the old wall can carry the weight. The City's 2016 figures put a 12 in cap addition at $75 to $125 per linear foot.
Sources
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
- King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
- City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
- Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
- Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
- CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
- Construction Industry Licensing Board: Archives (HB 1383 / SB 1142 specialty licensing changes), Florida Department of Business and Professional Regulation (DBPR), Construction Industry Licensing Board. Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.