Living shorelines in Miami Beach
Living shorelines in Miami Beach, where the wall behind them still has to meet the 5.7 ft NAVD standard.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
Riprap planted with mangroves in front of a wall, and seawalls with textured, pH-neutral panels that marine life can grow on.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Miami Beach's PPA grant repays 50% of eligible seawall or flood-proofing costs up to $20,000, with no match for qualifying lower income homes up to $17,500. Bay-facing Miami Beach lots sit on the Biscayne Bay Aquatic Preserve, so an exempt dock is limited to 500 sq ft over the water.
Last updated
Who this is for
Owners replacing a wall who want a softer edge, owners with mangroves along the shore, and Coral Gables owners who want the fee incentive.
The Private Property Adaptation grant
The City's PPA program reimburses 50% of eligible costs up to $20,000, including a $2,500 assessment, and qualifying low to moderate income households need no match up to $17,500. Homes built at least 1 ft above base flood elevation are not eligible, and seawall applications are taken on a rolling basis until funds run out.

That incentive can offset part of the cost of habitat features.[1]
Bay-side lots and the aquatic preserve
Lots that face open Biscayne Bay rather than a dredged canal sit on the Biscayne Bay Aquatic Preserve, which counts as Outstanding Florida Waters. There the state dock exemption is 500 sq ft of over-water area, and the preserve says manatees move into the bay in the cooler months.

Planting and rock placement stay off existing grass.[2][3][4]
What makes Miami Beach different
The city has about 55 miles of seawall, of which only about 5 miles are publicly owned, so most of it is the responsibility of private owners. Its seawall ordinance dates from Resolution R2016-4009 in May 2016, was strengthened in January 2021 and amended again in July 2025.[5][6]

Groundwater and flooding
The city notes that groundwater rises through the porous bedrock under Miami Beach, so a seawall alone cannot stop flooding. A raised wall stops tidal overtopping; drainage and flood protection handle the rest.[7]

Permits in Miami Beach
- City of Miami Beach Building Department: Building permit with a site plan, structural plans and an elevation certification.
- Miami-Dade DERM, Coastal Resources Section: Class I permit or exemption for seawalls, docks and lifts on the island canals and the bay, issued alongside the City permit. Phone (305) 372-6575.
- Florida DEP or South Florida Water Management District: State review where a dock or wall reaches open Biscayne Bay, part of the aquatic preserve, where FDEP's free online self-certification is not available.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in Biscayne Bay and Indian Creek; we confirm the small-project route since SPGP VI's stated July 2026 expiry.
Permits for living shorelines
Riprap follows the riprap rules: up to 10 ft waterward under SPGP VI and a state general permit for up to 100 linear feet at 2:1. In Miami-Dade, mangrove permits are valid for 3 years and limerock boulder riprap on a 2:1 slope gets an expedited authorisation after a DERM inspection.[11][8]

Frequently asked questions
Is there a grant for seawalls or flood protection in Miami Beach?
Yes. The Private Property Adaptation program reimburses 50% of eligible costs up to $20,000. Homes already 1 ft above base flood elevation do not qualify.
Does the aquatic preserve affect my Miami Beach dock?
If the dock is on open Biscayne Bay rather than a dredged canal, yes: the exemption limit is 500 sq ft of over-water area and FDEP's free self-certification is not available.
Sources
- Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
- Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Seawalls (Public Infrastructure), City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Press release: Miami Beach Receives Improved Class 5 Rating from FEMA (3 April 2019), City of Miami Beach, Department of Marketing and Communications. Accessed October 28, 2026.
- Solar, Open Air Dining, and Other Permits, City of Coral Gables. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
