SoFlo Marine Construction

Composite dock decking in Miami

Composite dock decking in Miami, designed for the bay preserve, where the dock exemption drops to 500 sq ft.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We re-deck existing docks and deck new ones, checking the framing and fasteners while the boards are up.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Miami's bayfront sits in the Biscayne Bay Aquatic Preserve, so an exempt private dock is capped at 500 sq ft over the water instead of the 1,000 sq ft allowed on artificial canals. DERM charges Miami owners $470 plus $25 per $1,000 of work above $10,000 for a short-form permit, plus a 7.5% surcharge.

Last updated

Who re-decks

Owners with splintering or soft boards on sound framing, and owners building a new dock who want less upkeep.

Bayfront lots sit on Outstanding Florida Waters

The Biscayne Bay Aquatic Preserve covers 64,607 acres from the Oleta River to Card Sound and is treated as Outstanding Florida Waters. On open bay frontage that halves the state dock exemption to 500 sq ft of over-water area, against 1,000 sq ft on an artificial canal, and seagrass damage in the preserve can bring a fine of up to $1,000.

Over grass, deck height and plank spacing matter as much as the board colour.[1][2][3]

What DERM charges in Miami

A DERM short-form permit costs $470 plus $25 for each $1,000 of construction above $10,000, and every fee carries a 7.5% surcharge. A seawall cap or tie rod job on DERM's expedited track has a $75 review fee, and after-the-fact applications for work already done pay double.

A deck-only replacement on the same frame is usually the simplest permit here.[4]

The 25% waterway rule on the county short form

Miami-Dade DERM handles a single-family dock, davit, boat lift or mooring pile on its short form only if the structure does not protrude more than 25% of the waterway width. On the narrower canals off the Miami River and Little River, that width test is often what decides how far a dock or lift can reach.

Overhead view of a new composite dock with a boat lift beside older docks on a turquoise canal

A redeck is the moment to check that the dock still fits the limit if you add width.[4]

What makes Miami waterfront work different

Most of Biscayne Bay and its natural tributaries, including the Miami River and Little River, are state-owned submerged lands, so docks over them need the state's consent alongside the DERM permit. The Biscayne Bay Aquatic Preserve is listed by DERM as a permitting contact, and FDEP's free online dock self-certification is not available in aquatic preserves. The federal seagrass range used in dock design reaches central Biscayne Bay.[4][3][5]

Older bayfront seawall with a coral rock face on Biscayne Bay, with high-rises across the water

City of Miami seawall height

In 2020 the City considered an ordinance (File 7338) to set a 6 ft NAVD 88 minimum for new and rebuilt seawalls east of US-1, outside the Miami River. We have not confirmed that it was adopted, so for every Miami seawall job we confirm the current height rule with the City before design.[6]

Private timber dock with a small boat on a calm river lined with mangroves and older waterfront homes

Permits in Miami

  • Miami-Dade DERM, Coastal Resources Section: Class I permit for any work in, on or over tidal water, the Miami River included, with exempt, expedited and short-form routes for small jobs. Phone (305) 372-6575.
  • City of Miami Building Department: Structural and zoning approval for seawalls, docks and lifts inside city limits.
  • Florida DEP or South Florida Water Management District: State permit or exemption, and consent to use the state-owned bottom of Biscayne Bay, the Miami River and Little River, which DERM grants for most of the bay on the state's behalf.
  • US Army Corps of Engineers, Jacksonville District: Federal sign-off for work in the bay and the river. SPGP VI, the small-project route, passed its stated 27 July 2026 expiry, so we confirm the current route for each job.

What we check before re-decking

  • Joists and stringers for rot
  • Fasteners and hardware for corrosion
  • Pilings at the waterline
  • Board spacing rules for your waterway

Decking and permits

A like-for-like re-deck is DERM-exempt in Miami-Dade, but your city may still need a permit. Making the dock bigger changes the over-water area, which FDEP counts toward the 500 or 1,000 sq ft exemption limits, so it needs a permit review.[4][3]

Dock with old boards removed to expose joists and new boards stacked ready

Frequently asked questions

Is a dock on Biscayne Bay in Miami treated differently from one on a canal?

Yes. The bay is an aquatic preserve and Outstanding Florida Waters, so the state exemption allows 500 sq ft over the water there, compared with 1,000 sq ft on an artificial canal, and FDEP's free online self-certification is not available.

What does a seawall or dock permit cost in Miami?

DERM's short form is $470 plus $25 per $1,000 of construction above $10,000, plus 7.5%; City building fees are extra. Work done without a permit pays double.

How far can a dock or boat lift stick out in Miami?

For DERM's short-form permit, no more than 25% of the waterway width. Bigger projects move to DERM's standard form, which goes to the County Commission with notice to neighbours within 300 ft.

Sources

  1. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  2. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  3. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  4. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  5. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  6. City of Miami File ID 7338 (Revision A): Ordinance amending Chapters 20, 29 and 54 to set seawall minimum heights (Second Reading, printed 5/19/2020), City of Miami. Accessed October 27, 2026.
  7. Letter to the Miami City Manager on Community Rating System verification (12 May 2022), with CRS verification report, FEMA, Federal Insurance and Mitigation Administration (hosted by the City of Miami). Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.