Composite dock decking in Boca Raton
Composite dock decking in Boca Raton, on docks that must sit between 4.0 and 6.0 ft NAVD88.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We re-deck existing docks and deck new ones, checking the framing and fasteners while the boards are up.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Boca Raton work follows Palm Beach County's manatee zones (rule 68C-22.009) and sits inside the federal Johnson's seagrass range. A freestanding dock in Boca Raton may reach only 6 to 8 ft past the seawall, depending on canal width (City Code 22-58).
Last updated
Who re-decks
Owners with splintering or soft boards on sound framing, and owners building a new dock who want less upkeep.
Palm Beach County manatee zones
Boca Raton waters fall under Palm Beach County's manatee protection zones in state rule 68C-22.009, with boating restricted areas in 68D-24.017 and 68D-24.011. The federal Johnson's seagrass range used for dock design also covers these waters, so pile and dock layouts avoid grass beds.

New decking is only as good as the frame and piles under it, so we check them first.[1][2]
Docks that stop 6 to 8 ft out
Single-family freestanding docks in Boca Raton may protrude no more than 6 to 8 ft waterward of the seawall, depending on canal width (City Code 22-58). That is much tighter than the limits in the other cities we serve, so marginal docks along the wall and seawall-mounted lifts are the usual answer.
A redeck is the moment to check that the dock still fits the limit if you add width.[3]
The 45 degree side lines
Boca Raton structures must stay inside lines projected waterward at 45 degrees from the side property lines, and the seawall wet face sits on the property line (Sec. 26-146). On a pie-shaped lot at the end of a canal those lines can shrink the space for a lift or davit to a few feet.[3]

What makes Boca Raton different
Plan review needs a current-conditions survey showing the seawall wet face or bulkhead line, the property line and piles, section details with the finished cap elevation, and a proposed site plan. Inspections are staged: a location survey before the cap is poured and before the structural cap and piling inspections, a final engineer report on cap elevation with photos, and a final marine structure survey for docks and lifts.[4]

Agencies beyond the City
Palm Beach County's marine structure checklist for unincorporated areas lists the outside approvals agencies expect to see: FDEP, the Florida Inland Navigation District (FIND) and the Army Corps, as applicable. That checklist is dated 2005, so we confirm current requirements for each job. The federal seagrass range used in dock design covers Palm Beach County waters.[5][2]

Permits in Boca Raton
- City of Boca Raton Development Services: Marine structure permits under City Code Chapter 22, with staged survey and engineer inspections.
- Florida Inland Navigation District (FIND): May be involved for work along the Intracoastal Waterway.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks, walls and lifts on Lake Boca Raton and the Intracoastal Waterway.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation along the Intracoastal, which the Palm Beach County checklist expects to see with the building permit.
What we check before re-decking
- Joists and stringers for rot
- Fasteners and hardware for corrosion
- Pilings at the waterline
- Board spacing rules for your waterway
Frequently asked questions
Do seagrass and manatee rules affect docks in Boca Raton?
Yes. Palm Beach County manatee zones (rule 68C-22.009) apply, and Boca is inside the federal Johnson's seagrass range used to review docks over grass.
How far out can a dock go in Boca Raton?
A single-family freestanding dock may protrude no more than 6 to 8 ft waterward of the seawall, depending on the canal width, under City Code 22-58.
Why does lot shape matter for a boat lift in Boca Raton?
Because structures must stay inside lines projected at 45 degrees from the side property lines. On narrow or pie-shaped lots that leaves less room.
Sources
- Manatee Data and Maps (county manatee protection zone and boating restricted area maps), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Engineering Design Standards Manual, section 7.7 Minimum Criteria for Waterway Features (PDF modified 10 Apr 2025), City of Boca Raton. Accessed October 28, 2026.
- Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.
- TYPE 8 Marine Structures (Dock, Seawall, Boatlift, Boathouse) Application Submittal Checklist, Palm Beach County Planning, Zoning and Building. Accessed October 27, 2026.
- Insure Your Property, City of Boca Raton. Accessed October 28, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.

