Composite dock decking in Miami Beach
Composite dock decking in Miami Beach, where each job needs a City permit and an elevation certificate.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We re-deck existing docks and deck new ones, checking the framing and fasteners while the boards are up.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
In Miami Beach, marine work needs a City building permit with an elevation certification and Miami-Dade DERM approval. On Miami Beach's narrow canals, DERM keeps docks, lifts and davits within 25% of the waterway width and may ask for a neighbour's consent.
Last updated
Who re-decks
Owners with splintering or soft boards on sound framing, and owners building a new dock who want less upkeep.
Two permits, one elevation certificate
A Miami Beach seawall or dock job needs a City building permit with a site plan, structural plans and an elevation certification, plus Miami-Dade DERM Coastal Resources approval. FDEP and the Army Corps come in where the work reaches state or federal waters, which on the island canals is common.

A deck-only replacement on the same frame is usually the simplest permit here.[1]
Narrow island canals and the 25% rule
On the narrower Miami Beach canals, DERM's short form allows a dock, lift or davit to reach no more than 25% of the waterway width. DERM also uses a D-5 boundary to protect a neighbour's view and access, so it may ask for a letter of consent from the lot next door.
A redeck is the moment to check that the dock still fits the limit if you add width.[2]
Bay-side lots and the aquatic preserve
Lots that face open Biscayne Bay rather than a dredged canal sit on the Biscayne Bay Aquatic Preserve, which counts as Outstanding Florida Waters. There the state dock exemption is 500 sq ft of over-water area, and the preserve says manatees move into the bay in the cooler months.

Over grass, deck height and plank spacing matter as much as the board colour.[3][4][5]
What makes Miami Beach different
The city has about 55 miles of seawall, of which only about 5 miles are publicly owned, so most of it is the responsibility of private owners. Its seawall ordinance dates from Resolution R2016-4009 in May 2016, was strengthened in January 2021 and amended again in July 2025.[1][7]

Groundwater and flooding
The city notes that groundwater rises through the porous bedrock under Miami Beach, so a seawall alone cannot stop flooding. A raised wall stops tidal overtopping; drainage and flood protection handle the rest.[8]

Permits in Miami Beach
- City of Miami Beach Building Department: Building permit with a site plan, structural plans and an elevation certification.
- Miami-Dade DERM, Coastal Resources Section: Class I permit or exemption for seawalls, docks and lifts on the island canals and the bay, issued alongside the City permit. Phone (305) 372-6575.
- Florida DEP or South Florida Water Management District: State review where a dock or wall reaches open Biscayne Bay, part of the aquatic preserve, where FDEP's free online self-certification is not available.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in Biscayne Bay and Indian Creek; we confirm the small-project route since SPGP VI's stated July 2026 expiry.
What we check before re-decking
- Joists and stringers for rot
- Fasteners and hardware for corrosion
- Pilings at the waterline
- Board spacing rules for your waterway
Frequently asked questions
Which permits does a Miami Beach seawall or dock need?
A City of Miami Beach building permit with a site plan, structural plans and an elevation certification, plus Miami-Dade DERM approval, and FDEP or Army Corps approval where they apply.
Can a neighbour object to my boat lift in Miami Beach?
DERM's D-5 boundary protects neighbours' view and access, and DERM may ask for a letter of consent. The lift must also stay within 25% of the waterway width for the short form.
Does the aquatic preserve affect my Miami Beach dock?
If the dock is on open Biscayne Bay rather than a dredged canal, yes: the exemption limit is 500 sq ft of over-water area and FDEP's free self-certification is not available.
Sources
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
- Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
- Seawalls (Public Infrastructure), City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- Press release: Miami Beach Receives Improved Class 5 Rating from FEMA (3 April 2019), City of Miami Beach, Department of Marketing and Communications. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.

