We size the lift to your boat's weight, set new pilings where needed, run the electrics and handle the permits. Moving an existing lift is planned the same way.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

In Key Largo, a boat lift installed within an existing slip did not need a seagrass survey under SPGP VI, and up to two uncovered lifts were allowed; projects inside the Florida Keys National Marine Sanctuary also need prior Sanctuary approval (US Army Corps of Engineers). ThePricer's 2026 South Florida range for a 10,000 lb four-post lift is $7,000 to $14,000 installed.

Last updated

Which lift suits you

The right lift depends on how you moor.

  • Four-post lift: on its own pilings in a slip beside the dock
  • Elevator lift: mounted on the seawall face, good where pilings are hard to place
  • Floating lift: for jet skis and small boats, no pilings

Typical project sizes

New pilings can turn a $10,000 lift project into $15,000 or more, so a slip with sound pilings costs less to fit out.

Uncovered or covered?

SPGP VI allowed two uncovered boat lifts. Adding a canopy changes the over-water area that state rules count.[1][2]

Boat on an elevator lift on a clear Keys canal with cleats and tie-down rings on the dock
Illustration: boat on an elevator lift on a clear Keys canal with cleats and tie-down rings on the dock.

Manatee watch during install

Setting pilings and the lift is in-water work, so it stops whenever a manatee comes within 50 ft and resumes once it has moved off or 30 minutes pass.[3]

Lift setbacks by type

Monroe County sets side setbacks by lift type: 7.5 ft for elevator lifts, 5 ft for personal watercraft lifts up to 1,500 lb, and 10 ft for a floating lift set along the shore. A four-post cradle lift is allowed only on a lot at least 70 ft wide on a man-made waterway at least 60 ft wide.

Empty boat lift cradle with carpeted bunks raised above calm canal water beside a dock

We choose the lift type and position to that rule before anything is ordered.[5]

Four feet of water, and more over grass

A Key Largo dock must end in at least 4 ft of water at mean low water. Over seagrass or hard bottom, the water must be 4 ft deep above the organisms, the deck at least 5 ft above mean high water, and the terminal platform no larger than 160 sq ft (8 by 20 ft), with a benthic survey to prove it.

Lift piles and floating lifts are kept off grass beds.[5]

What makes Key Largo different

The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[6]

Weathered seawall with riprap at its toe on a clear Keys canal below a stilt home

Sanctuary, seagrass and manatees

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[1][3]

Narrow elevated pier over shallow seagrass with a small terminal platform at the end in deeper water

Permits in Key Largo

  • Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
  • Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
  • US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.

Permits for a new lift

Miami-Dade issues a short-form DERM permit for a lift on a new or existing dock, seawall or bulkhead, as long as a single-family lift does not protrude more than 25% of the waterway width. Florida exempts floating boat lifts and floating platforms up to 500 sq ft combined (200 sq ft in Outstanding Florida Waters). In aquatic preserves, a roof may not overhang more than 1 ft beyond the lift and boat.[8][9][2]

Four new pilings driven for a boat lift beside a dock, before the top beams go on

Relocating a lift

Moving a lift to a new slip or a new home is a new installation in the eyes of the permit office, so we plan pilings and permits for the new spot. Removing the old lift and old piles is DERM-exempt in Miami-Dade.[8]

Boat lift installation costs
LiftFigureSource and scope
10,000 lb four-post, installed$7,000 to $14,000ThePricer, South Florida, 2026
10,000 lb elevator, equipment onlyAbout $12,480ThePricer, 2026
Hydraulic lift, equipment onlyAbout $10,505 to $27,987ThePricer, 2026
Installation labour$500 to $3,000 or moreThePricer, 2026
Secondary industry estimates. Source: ThePricer.org (secondary cost guide; cited in the FCC master plan), How Much Does a Boat Lift Cost? (updated 11 Aug 2026). Last updated October 28, 2026.

Frequently asked questions

What does a boat lift cost to install in Key Largo?

ThePricer's 2026 South Florida range for a 10,000 lb four-post lift is $7,000 to $14,000 installed. Keys access and new pilings can add to it.

Sources

  1. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  2. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  3. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  4. How Much Does a Boat Lift Cost? (updated 11 Aug 2026), ThePricer.org (secondary cost guide; cited in the FCC master plan). Accessed October 27, 2026.
  5. Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
  6. Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
  7. Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
  8. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  9. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.