SoFlo Marine Construction

Boat lift installation in Miami

A new boat lift on your Miami dock or seawall, permitted.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We size the lift to your boat's weight, set new pilings where needed, run the electrics and handle the permits. Moving an existing lift is planned the same way.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

A new boat lift in Miami needs a DERM short-form Class I permit, which covers lift installation on a new or existing dock, seawall or bulkhead, plus City of Miami approval (Miami-Dade DERM, 2025). For a project costing $5,000 to $9,999, DERM's application fee is $470 and the short-form permit fee $375, plus a 7.5% surcharge.

Last updated

Which lift suits you

The right lift depends on how you moor.

  • Four-post lift: on its own pilings in a slip beside the dock
  • Elevator lift: mounted on the seawall face, good where pilings are hard to place
  • Floating lift: for jet skis and small boats, no pilings

Typical project sizes

New pilings can turn a $10,000 lift project into $15,000 or more, so a slip with sound pilings costs less to fit out.

Installing in an existing slip

SPGP VI let lifts go into existing boat slips without a seagrass survey, the simplest route on Biscayne Bay waters inside the seagrass range. A lift in a new slip, or one that extends further out, gets more review.[2]

Boat raised on a seawall-mounted elevator lift at a canal home with palms and bougainvillea
Illustration: boat raised on a seawall-mounted elevator lift at a canal home with palms and bougainvillea.

Sizing to the waterway

DERM's short form only covers single-family lifts that protrude no more than 25% of the waterway width, which limits lift placement on narrow Miami canals. We measure the canal before choosing a four-post or seawall-mounted elevator lift.[1]

Bayfront lots sit on Outstanding Florida Waters

The Biscayne Bay Aquatic Preserve covers 64,607 acres from the Oleta River to Card Sound and is treated as Outstanding Florida Waters. On open bay frontage that halves the state dock exemption to 500 sq ft of over-water area, against 1,000 sq ft on an artificial canal, and seagrass damage in the preserve can bring a fine of up to $1,000.

Empty boat lift cradle with carpeted bunks raised above calm canal water beside a dock

Lift piles and floating lifts are kept off grass beds.[4][5][6]

What makes Miami waterfront work different

Most of Biscayne Bay and its natural tributaries, including the Miami River and Little River, are state-owned submerged lands, so docks over them need the state's consent alongside the DERM permit. The Biscayne Bay Aquatic Preserve is listed by DERM as a permitting contact, and FDEP's free online dock self-certification is not available in aquatic preserves. The federal seagrass range used in dock design reaches central Biscayne Bay.[1][6][2]

Older bayfront seawall with a coral rock face on Biscayne Bay, with high-rises across the water

City of Miami seawall height

In 2020 the City considered an ordinance (File 7338) to set a 6 ft NAVD 88 minimum for new and rebuilt seawalls east of US-1, outside the Miami River. We have not confirmed that it was adopted, so for every Miami seawall job we confirm the current height rule with the City before design.[7]

Private timber dock with a small boat on a calm river lined with mangroves and older waterfront homes

Permits in Miami

  • Miami-Dade DERM, Coastal Resources Section: Class I permit for any work in, on or over tidal water, the Miami River included, with exempt, expedited and short-form routes for small jobs. Phone (305) 372-6575.
  • City of Miami Building Department: Structural and zoning approval for seawalls, docks and lifts inside city limits.
  • Florida DEP or South Florida Water Management District: State permit or exemption, and consent to use the state-owned bottom of Biscayne Bay, the Miami River and Little River, which DERM grants for most of the bay on the state's behalf.
  • US Army Corps of Engineers, Jacksonville District: Federal sign-off for work in the bay and the river. SPGP VI, the small-project route, passed its stated 27 July 2026 expiry, so we confirm the current route for each job.

Permits for a new lift

Miami-Dade issues a short-form DERM permit for a lift on a new or existing dock, seawall or bulkhead, as long as a single-family lift does not protrude more than 25% of the waterway width. Florida exempts floating boat lifts and floating platforms up to 500 sq ft combined (200 sq ft in Outstanding Florida Waters). In aquatic preserves, a roof may not overhang more than 1 ft beyond the lift and boat.[1][5][6]

Four new pilings driven for a boat lift beside a dock, before the top beams go on

Relocating a lift

Moving a lift to a new slip or a new home is a new installation in the eyes of the permit office, so we plan pilings and permits for the new spot. Removing the old lift and old piles is DERM-exempt in Miami-Dade.[1]

Miami-Dade DERM Class I fees (short form)
Construction costApplication feePermit fee
$0 to $2,499$250$205
$2,500 to $4,999$425$205
$5,000 to $9,999$470$375
$10,000 to $19,999$470 plus $23 per $1,000 above $10,000$470 plus $25 per $1,000 above $10,000
$20,000 to $74,999$470 plus $25 per $1,000 above $10,000$470 plus $25 per $1,000 above $10,000
Both fees carry a 7.5% surcharge. After-the-fact permits pay double. Source: Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025). Last updated October 28, 2026.

Frequently asked questions

What does a boat lift cost to install in Miami?

ThePricer's 2026 guide puts a 10,000 lb four-post lift at $7,000 to $14,000 installed in South Florida. DERM and City permit fees are extra.

Sources

  1. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  2. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  3. How Much Does a Boat Lift Cost? (updated 11 Aug 2026), ThePricer.org (secondary cost guide; cited in the FCC master plan). Accessed October 27, 2026.
  4. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  5. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  6. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  7. City of Miami File ID 7338 (Revision A): Ordinance amending Chapters 20, 29 and 54 to set seawall minimum heights (Second Reading, printed 5/19/2020), City of Miami. Accessed October 27, 2026.
  8. Letter to the Miami City Manager on Community Rating System verification (12 May 2022), with CRS verification report, FEMA, Federal Insurance and Mitigation Administration (hosted by the City of Miami). Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.