Seawall inspections in Islamorada
Seawall inspections in Islamorada, where erosion-control walls are exempt from the shoreline setback.
Free Fast Quote
Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!
We inspect the cap, face, joints, tiebacks and toe at low tide and tell you plainly what to fix now, what can wait and what your city requires.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Islamorada's 20 to 50 ft shoreline setback does not apply to seawalls, riprap or bulkheads built for erosion control. In Islamorada, NGVD29 and NAVD88 elevations differ by about 1.5 ft on average, so old and new drawings must be converted before comparing.
Last updated
When to book an inspection
Book one when something changes, not only when something breaks.
- After a city citation or warning
- Before buying or selling a waterfront home
- After a hurricane or a run of king tides
- When you see new cracks, stains or sinkholes
Seawalls and riprap inside the setback
Islamorada's shoreline setback keeps buildings 20 to 50 ft from mean high water, but it does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or upland protection. Because the Keys are an area of critical state concern, the 2024 ordinance was approved by the Florida Department of Commerce.
The inspection notes which repairs are exempt and which need a permit.[1]
Watch the datum: about 1.5 ft
The Village notes that converting from NGVD29 to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County, and the shift varies from place to place. Old plans and new maps use different datums, so a cap or floor height has to be converted before anyone compares numbers.
Every inspection records the cap elevation against that standard.[2]
Bay side and ocean side tides differ fourfold
NOAA's Florida Bay gauge at Upper Matecumbe Key shows a great diurnal range of only 0.61 ft, with mean higher high water about 0.41 ft below NAVD 88, while the Hawk Channel gauge a short way across the key shows 2.28 ft (1983 to 2001 epoch). A lift or floating dock sized for one side of Islamorada is wrong for the other.

We inspect at the lowest tide of the week so the lower wall face and the toe are visible.[3][4]
Flood maps from 2005, new ones pending
Islamorada still builds to effective flood maps dated 18 February 2005. Preliminary maps went through appeals between March and June 2021, FEMA has not announced when they take effect, and the Village has promised six months' notice once it does.[2]
What makes Islamorada different
Principal buildings sit 20 ft from the mean high water line on altered shorelines such as canals, 30 ft on open water with conditions, and 50 ft on unaltered shorelines. Docks, lifts, davits, seawalls and riprap are water-dependent structures that may sit inside that setback under the Village's standards.[1]

Sanctuary and manatee layers
The federal small-project permit, SPGP VI, required Sanctuary sign-off before any Islamorada project in Keys waters, and crews follow the state manatee conditions on every in-water job.[5][6]

Permits in Islamorada
- Islamorada, Village of Islands, Planning and Development Services: Docks, lifts and shoreline structures under Village Code Chapter 30.
- Florida Keys National Marine Sanctuary: Sanctuary waters surround every Islamorada key from the mean high water mark; we confirm what Sanctuary approval each project needs.
- Florida DEP or South Florida Water Management District: State permit or exemption; part of the Village's water is the Lignumvitae Key Aquatic Preserve.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Sanctuary waters around the Village.
What we check
We walk the full length of the wall from the land and the water.

- Cap: cracks, spalling, rust staining, height against the local standard
- Face and panels: cracks, open joints, lean
- Tiebacks and anchors: signs of movement
- Toe: scour or undercutting
- Land side: sinkholes, soft ground, weep holes
Who is responsible for a private seawall?
The property owner. Miami Beach requires owners to correct walls that let tidal water flow over or through them and can cite owners with no seawall at all. Fort Lauderdale presumes a wall is in disrepair if it lets upland soil erode, material pass through it, or tidal water flow onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish.[7][8]
| City | Show progress | Finish | Other |
|---|---|---|---|
| Miami Beach | 60 days | 730 days | 10 days to appeal; fines $250 then $500 per day |
| Fort Lauderdale | 60 days | 365 days | Disrepair presumed if water or soil passes through |
Frequently asked questions
Does the shoreline setback stop seawall work in Islamorada?
No. The setback does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or protecting the upland.
Why do elevations on old Islamorada plans look different?
They may be in NGVD29. The Village says converting to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County.
Why does it matter which side of Islamorada I live on?
Because the tide is very different: about 0.61 ft great diurnal range on Florida Bay and 2.28 ft on Hawk Channel, per NOAA gauges at Upper Matecumbe Key.
Which flood maps apply in Islamorada?
The effective maps dated 18 February 2005. Preliminary maps were appealed in 2021; FEMA will give six months' notice before they take effect.
Sources
- Ordinance No. 24-15 amending Village Code Sec. 30-1542 Shoreline Setback, with Department of Commerce Final Order COM-24-043, Islamorada, Village of Islands. Accessed October 28, 2026.
- Floodplain Management, Islamorada, Village of Islands, Building Department. Accessed October 28, 2026.
- Datums for station 8723808, Islamorada, Upper Matecumbe Key, Florida Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723814, Upper Matecumbe Key, Hawk Channel (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.