We repair cracked caps and leaking joints, replace failing walls, raise seawalls to new city heights and protect the toe with riprap, across Miami-Dade, Broward, Palm Beach and the Keys.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
In Islamorada the Florida Bay tide swings about 0.61 ft but the Hawk Channel tide 2.28 ft, so bay and ocean lots need different designs. Islamorada's effective flood maps date from 18 February 2005, and FEMA has not yet set a date for the preliminary maps appealed in 2021.
Last updated
Typical project sizes
Most residential lots have 50 to 150 feet of waterfront, so a full replacement is usually a five or six figure project, while cap, crack and tieback repairs are much smaller. Fort Lauderdale's 2016 survey priced engineering and permitting alone at $2,000 to $5,000 per job.
Bay side and ocean side tides differ fourfold
NOAA's Florida Bay gauge at Upper Matecumbe Key shows a great diurnal range of only 0.61 ft, with mean higher high water about 0.41 ft below NAVD 88, while the Hawk Channel gauge a short way across the key shows 2.28 ft (1983 to 2001 epoch). A lift or floating dock sized for one side of Islamorada is wrong for the other.
The tide also sets how much of the wall can be worked on dry at low water, which changes crew time.[1][2]
Flood maps from 2005, new ones pending
Islamorada still builds to effective flood maps dated 18 February 2005. Preliminary maps went through appeals between March and June 2021, FEMA has not announced when they take effect, and the Village has promised six months' notice once it does.
Height is the first question on any wall job here, because it decides whether a repair can stay at the current cap or turns into a raise.[3]
Watch the datum: about 1.5 ft
The Village notes that converting from NGVD29 to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County, and the shift varies from place to place. Old plans and new maps use different datums, so a cap or floor height has to be converted before anyone compares numbers.[3]

Seawalls and riprap inside the setback
Islamorada's shoreline setback keeps buildings 20 to 50 ft from mean high water, but it does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or upland protection. Because the Keys are an area of critical state concern, the 2024 ordinance was approved by the Florida Department of Commerce.
We build that permit path into the schedule from the first site visit.[4]
What makes Islamorada different
Principal buildings sit 20 ft from the mean high water line on altered shorelines such as canals, 30 ft on open water with conditions, and 50 ft on unaltered shorelines. Docks, lifts, davits, seawalls and riprap are water-dependent structures that may sit inside that setback under the Village's standards.[4]

Sanctuary and manatee layers
The federal small-project permit, SPGP VI, required Sanctuary sign-off before any Islamorada project in Keys waters, and crews follow the state manatee conditions on every in-water job.[5][6]

Permits for seawalls in Islamorada
- Islamorada, Village of Islands, Planning and Development Services: Docks, lifts and shoreline structures under Village Code Chapter 30.
- Florida Keys National Marine Sanctuary: Sanctuary waters surround every Islamorada key from the mean high water mark; we confirm what Sanctuary approval each project needs.
- Florida DEP or South Florida Water Management District: State permit or exemption; part of the Village's water is the Lignumvitae Key Aquatic Preserve.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Sanctuary waters around the Village.
Which permits does seawall work need?
In Miami-Dade, any work in, on, over or upon tidal waters needs a DERM Class I permit under Section 24-48 of the County Code, including inside cities. Minor repairs are exempt, cap and tieback work gets an expedited authorisation, and rebuilding a wall at the mean high water line or up to 18 inches waterward is a short-form permit approved by staff.
The city building department also issues a structural permit. A state exemption does not remove county and city permits: Florida Statute 403.813 says its exemptions do not relieve anyone from county and municipal requirements, so in Miami-Dade a DERM Class I permit still applies.[7][8]
How long does a seawall last?
Fort Lauderdale's seawall ordinance FAQ assumed a design life of about 50 years, and city engineers described a 30 to 50 year lifespan for a wall built today. Salt water, wave action from boat wakes and rising tides shorten that when cracks and failed joints are left open.[10]

Why heights matter now
Cities are raising the bar. Miami Beach requires new and substantially repaired seawalls to reach 5.7 ft NAVD, Coral Gables sets bulkheads at a minimum of 6 ft NGVD 1929, and Fort Lauderdale requires 5 ft NAVD. A repair that triggers these rules can turn into a raising job, so we check the local standard before we price.[9][12][13]

| Item | Figure | Year and place |
|---|---|---|
| New or replacement seawall | $650 to $2,000 per linear foot | 2016, Fort Lauderdale contractor survey |
| Bringing an old seawall up to code | $1,000 to $1,500 per linear foot | 2017, Miami Beach rule of thumb |
| Engineering and permitting | $2,000 to $5,000 per job | 2016, Fort Lauderdale |
| Adding a 12-inch cap | $75 to $125 per linear foot | 2016, Fort Lauderdale |
| Cap spall repair | $60 per cubic foot of epoxy mortar | 2016, Fort Lauderdale |
Seawalls services in Islamorada
Seawall repair in Islamorada
Crack and spall repair, joint sealing, tiebacks, pilasters and backfill.
Seawall replacement in Islamorada
New concrete seawalls, usually built just in front of the failing wall.
Seawall caps in Islamorada
New and replacement concrete caps, including caps that raise the wall.
Seawall raising in Islamorada
Raising walls to Miami Beach, Coral Gables and other city height standards.
Riprap and toe protection in Islamorada
Limerock boulders, gunite tubes and sand-cement bags at the base of the wall.
Seawall inspections in Islamorada
Low-tide condition checks, including after a city notice or before a sale.
Frequently asked questions
Why does it matter which side of Islamorada I live on?
Because the tide is very different: about 0.61 ft great diurnal range on Florida Bay and 2.28 ft on Hawk Channel, per NOAA gauges at Upper Matecumbe Key.
Which flood maps apply in Islamorada?
The effective maps dated 18 February 2005. Preliminary maps were appealed in 2021; FEMA will give six months' notice before they take effect.
Why do elevations on old Islamorada plans look different?
They may be in NGVD29. The Village says converting to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County.
Does the shoreline setback stop seawall work in Islamorada?
No. The setback does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or protecting the upland.
Sources
- Datums for station 8723808, Islamorada, Upper Matecumbe Key, Florida Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723814, Upper Matecumbe Key, Hawk Channel (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Floodplain Management, Islamorada, Village of Islands, Building Department. Accessed October 28, 2026.
- Ordinance No. 24-15 amending Village Code Sec. 30-1542 Shoreline Setback, with Department of Commerce Final Order COM-24-043, Islamorada, Village of Islands. Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.