SoFlo Marine Construction

Seawall inspections in Key Largo

Seawall inspections in Key Largo, where new seawalls are allowed only on man-made canals.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We inspect the cap, face, joints, tiebacks and toe at low tide and tell you plainly what to fix now, what can wait and what your city requires.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

On Key Largo's ocean side, NOAA's Rock Harbor gauge shows a 2.37 ft great diurnal range. In Key Largo new vertical seawalls are allowed only on man-made canals and basins, while existing walls can be repaired or replaced on the same footprint.

Last updated

When to book an inspection

Book one when something changes, not only when something breaks.

  • After a city citation or warning
  • Before buying or selling a waterfront home
  • After a hurricane or a run of king tides
  • When you see new cracks, stains or sinkholes

Where a seawall is allowed at all

Monroe County allows vertical seawalls only to stabilise severely eroding shorelines on man-made canals, channels or basins, and never on open water. Lawfully existing walls may be repaired or replaced on the same footprint, the yard behind must sit at least 6 in below the top of the wall, and riprap goes at the toe wherever feasible.

Every inspection records the cap elevation against that standard.[1]

Ocean side tide at Rock Harbor

NOAA's Rock Harbor station on the Atlantic side of Key Largo records a 2.09 ft mean range and a 2.37 ft great diurnal range, with mean higher high water about 0.25 ft above NAVD 88 (1983 to 2001 epoch). There is no NOAA datum station on the bay side near Key Largo, so for bay side lots we measure the water on site.

Vertical crack and spalled concrete exposing rusty rebar on a seawall face above the waterline

We inspect at the lowest tide of the week so the lower wall face and the toe are visible.[2]

What makes Key Largo different

The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[3]

Weathered seawall with riprap at its toe on a clear Keys canal below a stilt home

Sanctuary, seagrass and manatees

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[4][5]

Narrow elevated pier over shallow seagrass with a small terminal platform at the end in deeper water

Permits in Key Largo

  • Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
  • Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
  • US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.

What we check

We walk the full length of the wall from the land and the water.

Gap at the base of an old seawall at low tide with sand washing out from behind the wall
  • Cap: cracks, spalling, rust staining, height against the local standard
  • Face and panels: cracks, open joints, lean
  • Tiebacks and anchors: signs of movement
  • Toe: scour or undercutting
  • Land side: sinkholes, soft ground, weep holes

Who is responsible for a private seawall?

The property owner. Miami Beach requires owners to correct walls that let tidal water flow over or through them and can cite owners with no seawall at all. Fort Lauderdale presumes a wall is in disrepair if it lets upland soil erode, material pass through it, or tidal water flow onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish.[7][8]

City deadlines after a seawall citation
CityShow progressFinishOther
Miami Beach60 days730 days10 days to appeal; fines $250 then $500 per day
Fort Lauderdale60 days365 daysDisrepair presumed if water or soil passes through
Sources: City of Miami Beach, Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25); City of Fort Lauderdale, Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3). Last updated October 28, 2026.

Frequently asked questions

Can I build a new seawall in Key Largo?

Only on a man-made canal, channel or basin to stop severe erosion, and only if plants or riprap will not work. Existing lawful walls can be repaired or replaced on the same footprint.

How much tide is there in Key Largo?

On the Atlantic side, NOAA's Rock Harbor gauge shows a 2.09 ft mean range and a 2.37 ft great diurnal range. On the bay side we measure on site.

Sources

  1. Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
  2. Datums for station 8723689, Rock Harbor, Key Largo (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  3. Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
  4. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  5. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  6. Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
  7. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  8. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  9. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.