We design and build replacement seawalls with engineered drawings, the county and city permits, and a turbidity barrier in the water while we work.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
In Islamorada the Florida Bay tide swings about 0.61 ft but the Hawk Channel tide 2.28 ft, so bay and ocean lots need different designs. In Islamorada, NGVD29 and NAVD88 elevations differ by about 1.5 ft on average, so old and new drawings must be converted before comparing.
Last updated
When replacement makes sense
Replacement is the answer when panels are cracked through, the wall leans, repairs would cost more than half of a new wall, or the wall is too low for your city's new standard.
- Panels cracked through or leaning
- Repeated sinkholes despite repairs
- A city notice to raise or rebuild
- Planned dock or lift work that needs a sound wall
Typical project sizes
On a 75 foot lot, the 2016 range of $650 to $2,000 per linear foot works out at roughly $48,750 to $150,000 before engineering, permits and any dock or lift reset. Today's prices are higher than in 2016.
Bay side and ocean side tides differ fourfold
NOAA's Florida Bay gauge at Upper Matecumbe Key shows a great diurnal range of only 0.61 ft, with mean higher high water about 0.41 ft below NAVD 88, while the Hawk Channel gauge a short way across the key shows 2.28 ft (1983 to 2001 epoch). A lift or floating dock sized for one side of Islamorada is wrong for the other.
The tide also sets how much of the wall can be worked on dry at low water, which changes crew time.[1][2]
Watch the datum: about 1.5 ft
The Village notes that converting from NGVD29 to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County, and the shift varies from place to place. Old plans and new maps use different datums, so a cap or floor height has to be converted before anyone compares numbers.
A replacement wall is built to the current height from the start, so the panels, piles and cap are sized for it.[3]
Flood maps from 2005, new ones pending
Islamorada still builds to effective flood maps dated 18 February 2005. Preliminary maps went through appeals between March and June 2021, FEMA has not announced when they take effect, and the Village has promised six months' notice once it does.[3]

Seawalls and riprap inside the setback
Islamorada's shoreline setback keeps buildings 20 to 50 ft from mean high water, but it does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or upland protection. Because the Keys are an area of critical state concern, the 2024 ordinance was approved by the Florida Department of Commerce.
A full replacement needs the complete permit set, so we start on drawings and surveys early.[4]
What makes Islamorada different
Principal buildings sit 20 ft from the mean high water line on altered shorelines such as canals, 30 ft on open water with conditions, and 50 ft on unaltered shorelines. Docks, lifts, davits, seawalls and riprap are water-dependent structures that may sit inside that setback under the Village's standards.[4]

Sanctuary and manatee layers
The federal small-project permit, SPGP VI, required Sanctuary sign-off before any Islamorada project in Keys waters, and crews follow the state manatee conditions on every in-water job.[5][6]

Permits in Islamorada
- Islamorada, Village of Islands, Planning and Development Services: Docks, lifts and shoreline structures under Village Code Chapter 30.
- Florida Keys National Marine Sanctuary: Sanctuary waters surround every Islamorada key from the mean high water mark; we confirm what Sanctuary approval each project needs.
- Florida DEP or South Florida Water Management District: State permit or exemption; part of the Village's water is the Lignumvitae Key Aquatic Preserve.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Sanctuary waters around the Village.
What a seawall replacement involves
A Florida engineer designs the wall to the site's soil, water depth and the local top elevation. Most replacements go in front of the old wall, which stays in place as backing, because removing it can undermine the yard.

- Survey and engineered drawings
- DERM, city and state approvals
- Turbidity barrier and manatee watch in the water
- New panels or sheet piles, tiebacks and cap
- Backfill, drainage and yard restoration
How far out can the new wall go?
Florida Statute 403.813 exempts restoring a seawall at its previous location, upland of it, or within 18 inches waterward of it. Miami-Dade's short form and the federal SPGP VI use the same 18 inch line, measured wet face to wet face, and need no seagrass survey within it.[10][9][5]
Federal permits
Under SPGP VI, the Florida DEP could verify the federal Army Corps authorisation for qualifying seawall work along with the state decision. That permit's stated expiration date was 27 July 2026, and we have not been able to confirm a replacement, so for each job we confirm the federal route with the agencies before we file.[5][11]
Working around manatees
Permits attach the state's Standard Manatee Conditions: all in-water work stops if a manatee comes within 50 ft, and resumes only once it has moved beyond 50 ft or 30 minutes pass without it reappearing. Turbidity barriers must not entangle or block manatees.[6]

| Item | Figure | Year and place |
|---|---|---|
| New or replacement seawall | $650 to $2,000 per linear foot | 2016, Fort Lauderdale |
| Engineering and permitting | $2,000 to $5,000 per job | 2016, Fort Lauderdale |
| Old seawall brought up to code | $1,000 to $1,500 per linear foot | 2017, Miami Beach |
| DERM application fee, $20,000 to $74,999 job | $470 plus $25 per $1,000 above $10,000 | 2025, Miami-Dade |
Frequently asked questions
Why does it matter which side of Islamorada I live on?
Because the tide is very different: about 0.61 ft great diurnal range on Florida Bay and 2.28 ft on Hawk Channel, per NOAA gauges at Upper Matecumbe Key.
Why do elevations on old Islamorada plans look different?
They may be in NGVD29. The Village says converting to NAVD88 shifts elevations by about -1.5 ft on average in Monroe County.
Which flood maps apply in Islamorada?
The effective maps dated 18 February 2005. Preliminary maps were appealed in 2021; FEMA will give six months' notice before they take effect.
Does the shoreline setback stop seawall work in Islamorada?
No. The setback does not apply to seawalls, riprap and bulkheads whose purpose is erosion control or protecting the upland.
Sources
- Datums for station 8723808, Islamorada, Upper Matecumbe Key, Florida Bay (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Datums for station 8723814, Upper Matecumbe Key, Hawk Channel (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Floodplain Management, Islamorada, Village of Islands, Building Department. Accessed October 28, 2026.
- Ordinance No. 24-15 amending Village Code Sec. 30-1542 Shoreline Setback, with Department of Commerce Final Order COM-24-043, Islamorada, Village of Islands. Accessed October 28, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Federal Permits and Coordination Agreements Between DEP, WMDs, and the U.S. Army Corps of Engineers, Florida Department of Environmental Protection (FDEP). Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.