Seawall inspections in Fort Lauderdale

Seawall inspections in Fort Lauderdale, where walls that let tide water onto the street can be cited.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We inspect the cap, face, joints, tiebacks and toe at low tide and tell you plainly what to fix now, what can wait and what your city requires.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Fort Lauderdale can cite owners whose seawalls let king tide water reach the street, and asks for overtopped walls to be raised to 5 ft. Fort Lauderdale's 2016 figures put a 12 in cap addition at $75 to $125 per linear foot and cap spall repair at $60 per cubic foot of epoxy mortar.

Last updated

When to book an inspection

Book one when something changes, not only when something breaks.

  • After a city citation or warning
  • Before buying or selling a waterfront home
  • After a hurricane or a run of king tides
  • When you see new cracks, stains or sinkholes

King tides and street flooding

The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.

An inspection report tells you which side of that line your wall sits on before a city notice does.[1][2]

Cap repairs and cap additions, priced

The same City material priced cap spall repair at $60 per cubic foot of epoxy mortar and adding a 12 in cap to an existing wall at $75 to $125 per linear foot (2016 figures). Whether an old wall can carry a taller cap is an engineering question, so a marine or structural engineer checks it first.

The report ranks repairs by cost so you can plan spending against those figures.[3]

5 ft NAVD88, with a path to 2050

New and substantially repaired tidal barriers in Fort Lauderdale must reach 5 ft NAVD88. A wall permitted before 1 January 2035 may be built at 4 ft NAVD88 if it is designed to be raised to 5 ft by 1 January 2050, which is how many owners spread the cost.

Vertical crack and spalled concrete exposing rusty rebar on a seawall face above the waterline

Every inspection records the cap elevation against that standard.[2]

River tide and inlet tide

NOAA's South Port Everglades gauge shows a 2.79 ft great diurnal range, while the Andrews Avenue bridge gauge up the New River shows 2.28 ft, with mean higher high water about 0.45 to 0.57 ft above NAVD 88 (1983 to 2001 epoch). Lifts and floating docks near the inlet need more travel than those up the river.

We inspect at the lowest tide of the week so the lower wall face and the toe are visible.[4][5]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[2][1]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[6][2]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

What we check

We walk the full length of the wall from the land and the water.

Gap at the base of an old seawall at low tide with sand washing out from behind the wall
  • Cap: cracks, spalling, rust staining, height against the local standard
  • Face and panels: cracks, open joints, lean
  • Tiebacks and anchors: signs of movement
  • Toe: scour or undercutting
  • Land side: sinkholes, soft ground, weep holes

Who is responsible for a private seawall?

The property owner. Miami Beach requires owners to correct walls that let tidal water flow over or through them and can cite owners with no seawall at all. Fort Lauderdale presumes a wall is in disrepair if it lets upland soil erode, material pass through it, or tidal water flow onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish.[10][2]

City deadlines after a seawall citation
CityShow progressFinishOther
Miami Beach60 days730 days10 days to appeal; fines $250 then $500 per day
Fort Lauderdale60 days365 daysDisrepair presumed if water or soil passes through
Sources: City of Fort Lauderdale, Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3); City of Miami Beach, Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25). Last updated October 28, 2026.

Frequently asked questions

Can Fort Lauderdale make me fix my seawall?

Yes. The City can cite walls that contribute to tidal flooding of the street, and after notice owners have 60 days to show progress and 365 days to finish.

Can I just add a cap to reach 5 ft in Fort Lauderdale?

Often, if an engineer confirms the old wall can carry the weight. The City's 2016 figures put a 12 in cap addition at $75 to $125 per linear foot.

How high does a seawall need to be in Fort Lauderdale?

5 ft NAVD88 for new and substantially repaired walls. Walls permitted before 1 January 2035 can be 4 ft if designed to be raised to 5 ft by 1 January 2050.

How much does the tide move in Fort Lauderdale?

About 2.79 ft (great diurnal range) at South Port Everglades and 2.28 ft at the Andrews Avenue bridge on the New River, per NOAA's 1983 to 2001 datums.

Sources

  1. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  2. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  3. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  4. Datums for station 8722956, South Port Everglades, ICWW (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  5. Datums for station 8722937, Fort Lauderdale, Andrews Ave. Bridge (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  6. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  7. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  8. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  9. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  10. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.