SoFlo Marine Construction

Seawall caps in Key Largo

Seawall caps in Key Largo, where new seawalls are allowed only on man-made canals.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

A new cap seals the top of the wall, ties the panels together and can add height. We check first that the existing wall can carry the extra weight.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

In Key Largo new vertical seawalls are allowed only on man-made canals and basins, while existing walls can be repaired or replaced on the same footprint. On Key Largo's ocean side, NOAA's Rock Harbor gauge shows a 2.37 ft great diurnal range.

Last updated

When a new cap is the right fix

A cap replacement suits a wall whose panels are sound but whose cap is cracked, spalled or too low.

  • Cracked or spalled cap with rust staining
  • Wall a little below the city's new height
  • Panels separating at the top

Typical project sizes

Cap jobs usually run the full length of the lot. At the 2016 rate of $75 to $125 per linear foot, a 12-inch cap on 75 feet of wall is about $5,625 to $9,375 before permits.

Where a seawall is allowed at all

Monroe County allows vertical seawalls only to stabilise severely eroding shorelines on man-made canals, channels or basins, and never on open water. Lawfully existing walls may be repaired or replaced on the same footprint, the yard behind must sit at least 6 in below the top of the wall, and riprap goes at the toe wherever feasible.

A new cap is often the cheapest way to reach that height, if the old wall can carry the extra weight.[1]

Ocean side tide at Rock Harbor

NOAA's Rock Harbor station on the Atlantic side of Key Largo records a 2.09 ft mean range and a 2.37 ft great diurnal range, with mean higher high water about 0.25 ft above NAVD 88 (1983 to 2001 epoch). There is no NOAA datum station on the bay side near Key Largo, so for bay side lots we measure the water on site.

Vertical crack and spalled concrete exposing rusty rebar on a seawall face above the waterline

Caps are formed and poured above the water, but the tide decides how high the new cap must sit to give real freeboard.[2]

What makes Key Largo different

The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[3]

Weathered seawall with riprap at its toe on a clear Keys canal below a stilt home

Sanctuary, seagrass and manatees

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[4][5]

Narrow elevated pier over shallow seagrass with a small terminal platform at the end in deeper water

Permits in Key Largo

  • Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
  • Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
  • US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.

Can the wall take a new cap?

Not always. Whether a cap can be added depends on whether the existing wall can bear the weight, which a marine or structural engineer must assess. A wall that cannot take it needs replacing instead.[7]

Freshly poured smooth concrete seawall cap with timber formwork along the edge

Permits for cap work

Miami-Dade DERM gives cap repair or replacement an expedited administrative authorisation when the building department has approved the structural plans. At the state level, seawall caps, batter piles and king piles used only to stabilise and repair seawalls fall under an exemption in rule 62-330.051(12)(d).[8][4]

Caps and city height rules

In Miami Beach a wall may be built to 4 ft NAVD if it is designed to support a future 5.7 ft NAVD, so the cap and footing need to be designed for that later raise. In Boca Raton the city must approve a location survey before the cap is poured, and a final engineer report confirms the cap elevation.[9][10]

Seawall cap cost and permit figures
ItemFigureSource year
New 12-inch cap$75 to $125 per linear foot2016 (Fort Lauderdale)
Cap spall repair$60 per cubic foot of epoxy mortar2016 (Fort Lauderdale)
DERM expedited cap review$75 plus 7.5% surcharge2025 (Miami-Dade)
Sources: Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017); Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025). Last updated October 28, 2026.

Frequently asked questions

Can I build a new seawall in Key Largo?

Only on a man-made canal, channel or basin to stop severe erosion, and only if plants or riprap will not work. Existing lawful walls can be repaired or replaced on the same footprint.

How much tide is there in Key Largo?

On the Atlantic side, NOAA's Rock Harbor gauge shows a 2.09 ft mean range and a 2.37 ft great diurnal range. On the bay side we measure on site.

Sources

  1. Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
  2. Datums for station 8723689, Rock Harbor, Key Largo (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  3. Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
  4. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  5. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  6. Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
  7. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  8. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  9. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  10. Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.

Get a free quote