We repair cracked caps and leaking joints, replace failing walls, raise seawalls to new city heights and protect the toe with riprap, across Miami-Dade, Broward, Palm Beach and the Keys.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
In Key Largo there is no DERM; seawall work goes through Monroe County and the state, and projects inside the Florida Keys National Marine Sanctuary need the Sanctuary's prior approval (US Army Corps of Engineers, SPGP VI). Florida law exempts restoring a seawall at its old location or up to 18 inches waterward, but county permits still apply.
Last updated
Typical project sizes
Most residential lots have 50 to 150 feet of waterfront, so a full replacement is usually a five or six figure project, while cap, crack and tieback repairs are much smaller. Fort Lauderdale's 2016 survey priced engineering and permitting alone at $2,000 to $5,000 per job.
State and federal limits
Replacement walls and riprap repairs may sit no more than 18 inches waterward of the old wet face, and new riprap no more than 10 ft waterward of mean high water, under SPGP VI. No seagrass survey was needed within the 18 inch line.[1][2]
Working in Keys water
All in-water work follows the state's manatee conditions: work stops if a manatee comes within 50 ft, vessels run at idle speed and no wake, and turbidity barriers must not trap or block manatees.[3]
Where a seawall is allowed at all
Monroe County allows vertical seawalls only to stabilise severely eroding shorelines on man-made canals, channels or basins, and never on open water. Lawfully existing walls may be repaired or replaced on the same footprint, the yard behind must sit at least 6 in below the top of the wall, and riprap goes at the toe wherever feasible.

Height is the first question on any wall job here, because it decides whether a repair can stay at the current cap or turns into a raise.[4]
Ocean side tide at Rock Harbor
NOAA's Rock Harbor station on the Atlantic side of Key Largo records a 2.09 ft mean range and a 2.37 ft great diurnal range, with mean higher high water about 0.25 ft above NAVD 88 (1983 to 2001 epoch). There is no NOAA datum station on the bay side near Key Largo, so for bay side lots we measure the water on site.
The tide also sets how much of the wall can be worked on dry at low water, which changes crew time.[5]
What makes Key Largo different
The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[6]

Sanctuary, seagrass and manatees
Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[1][3]

Permits for seawalls in Key Largo
- Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
- Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
- Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
- US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.
Which permits does seawall work need?
In Miami-Dade, any work in, on, over or upon tidal waters needs a DERM Class I permit under Section 24-48 of the County Code, including inside cities. Minor repairs are exempt, cap and tieback work gets an expedited authorisation, and rebuilding a wall at the mean high water line or up to 18 inches waterward is a short-form permit approved by staff.
The city building department also issues a structural permit. A state exemption does not remove county and city permits: Florida Statute 403.813 says its exemptions do not relieve anyone from county and municipal requirements, so in Miami-Dade a DERM Class I permit still applies.[8][2]
How long does a seawall last?
Fort Lauderdale's seawall ordinance FAQ assumed a design life of about 50 years, and city engineers described a 30 to 50 year lifespan for a wall built today. Salt water, wave action from boat wakes and rising tides shorten that when cracks and failed joints are left open.[10]

Why heights matter now
Cities are raising the bar. Miami Beach requires new and substantially repaired seawalls to reach 5.7 ft NAVD, Coral Gables sets bulkheads at a minimum of 6 ft NGVD 1929, and Fort Lauderdale requires 5 ft NAVD. A repair that triggers these rules can turn into a raising job, so we check the local standard before we price.[9][12][13]

| Item | Figure | Year and place |
|---|---|---|
| New or replacement seawall | $650 to $2,000 per linear foot | 2016, Fort Lauderdale contractor survey |
| Bringing an old seawall up to code | $1,000 to $1,500 per linear foot | 2017, Miami Beach rule of thumb |
| Engineering and permitting | $2,000 to $5,000 per job | 2016, Fort Lauderdale |
| Adding a 12-inch cap | $75 to $125 per linear foot | 2016, Fort Lauderdale |
| Cap spall repair | $60 per cubic foot of epoxy mortar | 2016, Fort Lauderdale |
Seawalls services in Key Largo
Seawall repair in Key Largo
Crack and spall repair, joint sealing, tiebacks, pilasters and backfill.
Seawall replacement in Key Largo
New concrete seawalls, usually built just in front of the failing wall.
Seawall caps in Key Largo
New and replacement concrete caps, including caps that raise the wall.
Seawall raising in Key Largo
Raising walls to Miami Beach, Coral Gables and other city height standards.
Riprap and toe protection in Key Largo
Limerock boulders, gunite tubes and sand-cement bags at the base of the wall.
Seawall inspections in Key Largo
Low-tide condition checks, including after a city notice or before a sale.
Frequently asked questions
Does DERM apply in Key Largo?
No. DERM is Miami-Dade County's agency. Key Largo is in Monroe County, so county, state and federal permits apply.
Can I put riprap in front of my Key Largo seawall?
Under SPGP VI, new riprap could extend up to 10 ft waterward of mean high water. Sanctuary and county review still apply.
Sources
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
- Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
- Datums for station 8723689, Rock Harbor, Key Largo (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
- Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
- Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.