Dock construction in Miami Beach

Dock construction in Miami Beach, where DERM keeps docks and lifts within 25% of the canal width.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

From survey and drawings to pilings, framing and decking, we build fixed docks on canals, the Intracoastal and open bay water.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

On Miami Beach's narrow canals, DERM keeps docks, lifts and davits within 25% of the waterway width and may ask for a neighbour's consent. In Miami Beach, marine work needs a City building permit with an elevation certification and Miami-Dade DERM approval.

Last updated

Who this is for

Owners adding a first dock, replacing a dock that is beyond repair, or redesigning a dock for a new boat or lift.

Typical project sizes

Most single-family docks are small enough for the state exemption: up to 1,000 sq ft of over-water area outside Outstanding Florida Waters. Larger docks of up to 2,000 sq ft and no more than two vessels can go through an FDEP general permit.

Narrow island canals and the 25% rule

On the narrower Miami Beach canals, DERM's short form allows a dock, lift or davit to reach no more than 25% of the waterway width. DERM also uses a D-5 boundary to protect a neighbour's view and access, so it may ask for a letter of consent from the lot next door.

Modern private dock and boat lift at a bayfront home with the city skyline faint across the water
Illustration: modern private dock and boat lift at a bayfront home with the city skyline faint across the water.

We design new docks to that limit first, then fit the boat and the lift around it.[1]

Two permits, one elevation certificate

A Miami Beach seawall or dock job needs a City building permit with a site plan, structural plans and an elevation certification, plus Miami-Dade DERM Coastal Resources approval. FDEP and the Army Corps come in where the work reaches state or federal waters, which on the island canals is common.

A new dock needs the full drawing set, so we start on surveys while the design is settled.[2]

Bay-side lots and the aquatic preserve

Lots that face open Biscayne Bay rather than a dredged canal sit on the Biscayne Bay Aquatic Preserve, which counts as Outstanding Florida Waters. There the state dock exemption is 500 sq ft of over-water area, and the preserve says manatees move into the bay in the cooler months.

Overhead view of a new composite dock with a boat lift beside older docks on a turquoise canal

A bottom survey comes before the layout so the dock clears any grass.[3][4][5]

What makes Miami Beach different

The city has about 55 miles of seawall, of which only about 5 miles are publicly owned, so most of it is the responsibility of private owners. Its seawall ordinance dates from Resolution R2016-4009 in May 2016, was strengthened in January 2021 and amended again in July 2025.[2][7]

Two neighbouring seawalls of different heights on a bay-side island canal, one with a new taller cap

Groundwater and flooding

The city notes that groundwater rises through the porous bedrock under Miami Beach, so a seawall alone cannot stop flooding. A raised wall stops tidal overtopping; drainage and flood protection handle the rest.[8]

Two boats on four-post lifts behind modern homes on a narrow canal with clean seawall caps

Permits in Miami Beach

  • City of Miami Beach Building Department: Building permit with a site plan, structural plans and an elevation certification.
  • Miami-Dade DERM, Coastal Resources Section: Class I permit or exemption for seawalls, docks and lifts on the island canals and the bay, issued alongside the City permit. Phone (305) 372-6575.
  • Florida DEP or South Florida Water Management District: State review where a dock or wall reaches open Biscayne Bay, part of the aquatic preserve, where FDEP's free online self-certification is not available.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in Biscayne Bay and Indian Creek; we confirm the small-project route since SPGP VI's stated July 2026 expiry.

How a new dock gets built

New dock framing of pressure-treated joists and stringers bolted to pilings over a canal
  1. Survey of the shoreline, water depth and any seagrass
  2. Design and engineered drawings
  3. County, city and state approvals
  4. Pilings driven or jetted, with manatee precautions
  5. Framing, decking, cleats and lighting
  6. Final inspections

Seagrass and dock design

In Johnson's seagrass range, which runs from Palm Bay south to central Biscayne Bay, docks over seagrass must follow federal minor piling-supported structure guidelines. In aquatic preserves a single-family dock is limited to a 4 ft wide walkway and a 160 sq ft terminal platform, and may not extend more than 500 ft or 20% of the waterbody width.[11][5]

Healthy seagrass bed on a sandy bottom in clear shallow water next to mangrove roots

Neighbours and view lines

Miami-Dade uses a D-5 boundary to protect neighbours' view and access. A dock beyond it may need consent letters from adjacent owners.[1]

New dock cost figures
ItemFigureSource and scope
Dock, built$7,000 to $25,000, average $15,000Fixr, national, 2025
Piling dock$20 to $40 per sq ft installedFixr, national, 2025
Removing an old dock first$250 to $1,000Fixr, national, 2025
DERM application fee, $10,000 to $19,999 job$470 plus $23 per $1,000 above $10,000Miami-Dade, 2025
Fixr figures are national estimates. DERM fees carry a 7.5% surcharge and a separate permit fee. Sources: Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025); Fixr.com (secondary national cost guide), Cost to Build a Dock (updated 31 Jan 2025). Last updated October 28, 2026.

Frequently asked questions

Can a neighbour object to my boat lift in Miami Beach?

DERM's D-5 boundary protects neighbours' view and access, and DERM may ask for a letter of consent. The lift must also stay within 25% of the waterway width for the short form.

Which permits does a Miami Beach seawall or dock need?

A City of Miami Beach building permit with a site plan, structural plans and an elevation certification, plus Miami-Dade DERM approval, and FDEP or Army Corps approval where they apply.

Does the aquatic preserve affect my Miami Beach dock?

If the dock is on open Biscayne Bay rather than a dredged canal, yes: the exemption limit is 500 sq ft of over-water area and FDEP's free self-certification is not available.

Sources

  1. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  2. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  3. Biscayne Bay Aquatic Preserve, Florida Department of Environmental Protection, Office of Resilience and Coastal Protection. Accessed October 28, 2026.
  4. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  5. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.
  6. Private Property Adaptation (PPA) program, City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  7. Seawalls (Public Infrastructure), City of Miami Beach (Miami Beach Rising Above). Accessed October 27, 2026.
  8. Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
  9. Press release: Miami Beach Receives Improved Class 5 Rating from FEMA (3 April 2019), City of Miami Beach, Department of Marketing and Communications. Accessed October 28, 2026.
  10. Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.