Dock construction in Key Largo

We build new docks in Key Largo, including length exceptions.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

From survey and drawings to pilings, framing and decking, we build fixed docks on canals, the Intracoastal and open bay water.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

A new dock in Key Largo must fit Monroe County's length limit under Code section 118-12(m)(15), or go through a Dock Length Special Exception with a $1,450 application fee plus $3 per shoreline owner within 300 ft (Monroe County, 2026). Fixr's 2025 national range for a new dock is $7,000 to $25,000, and long Keys docks sit at the upper end.

Last updated

Who this is for

Owners adding a first dock, replacing a dock that is beyond repair, or redesigning a dock for a new boat or lift.

Typical project sizes

Most single-family docks are small enough for the state exemption: up to 1,000 sq ft of over-water area outside Outstanding Florida Waters. Larger docks of up to 2,000 sq ft and no more than two vessels can go through an FDEP general permit.

The special exception process

Owners describe the submerged lands the dock crosses (sand, seagrass, corals) and the minimum extra length needed to reach adequate depth, with a site plan by a Florida registered architect, engineer or landscape architect.[1]

Federal and Sanctuary layer

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI, and docks over seagrass follow federal piling-supported structure guidelines.[2]

10% of the water, 25% with the boat

Monroe County Code 118-12(m) keeps a Key Largo dock to 10% of the waterbody width, measured mean low water to mean low water, and the dock together with the moored boat and any lift to 25% of the navigable width. On a 50 ft canal that is a 5 ft dock.

Overhead view of a new composite dock with a boat lift beside older docks on a turquoise canal

We design new docks to that limit first, then fit the boat and the lift around it.[4]

Four feet of water, and more over grass

A Key Largo dock must end in at least 4 ft of water at mean low water. Over seagrass or hard bottom, the water must be 4 ft deep above the organisms, the deck at least 5 ft above mean high water, and the terminal platform no larger than 160 sq ft (8 by 20 ft), with a benthic survey to prove it.

A bottom survey comes before the layout so the dock clears any grass.[4]

What makes Key Largo different

The special exception application asks owners to describe the submerged lands the dock crosses, such as sand, seagrass or coral, and the minimum extra length needed to reach adequate water depth. The site plan must be prepared by a Florida registered architect, engineer or landscape architect and show the mean high water line and shoreline setbacks.[1]

Weathered seawall with riprap at its toe on a clear Keys canal below a stilt home

Sanctuary, seagrass and manatees

Projects inside the Florida Keys National Marine Sanctuary needed prior Sanctuary approval under SPGP VI. The same permit let boat lifts and minor structures in Monroe County go into existing boat slips without a seagrass survey. All in-water work follows the state manatee conditions.[2][5]

Narrow elevated pier over shallow seagrass with a small terminal platform at the end in deeper water

Permits in Key Largo

  • Monroe County Planning and Environmental Resources Department: Dock length special exceptions under County Code section 118-12(m)(15).
  • Florida Keys National Marine Sanctuary: The Sanctuary starts at mean high water, so Key Largo canal and bay work is inside it; SPGP VI required its prior approval.
  • Florida DEP or South Florida Water Management District: State permit or exemption, which Monroe County needs to see before it issues a Notice to Proceed for docks, seawalls and ramps.
  • US Army Corps of Engineers, Jacksonville District: Federal permit, also required before the County's Notice to Proceed.

How a new dock gets built

New dock framing of pressure-treated joists and stringers bolted to pilings over a canal
  1. Survey of the shoreline, water depth and any seagrass
  2. Design and engineered drawings
  3. County, city and state approvals
  4. Pilings driven or jetted, with manatee precautions
  5. Framing, decking, cleats and lighting
  6. Final inspections

Seagrass and dock design

In Johnson's seagrass range, which runs from Palm Bay south to central Biscayne Bay, docks over seagrass must follow federal minor piling-supported structure guidelines. In aquatic preserves a single-family dock is limited to a 4 ft wide walkway and a 160 sq ft terminal platform, and may not extend more than 500 ft or 20% of the waterbody width.[2][9]

Healthy seagrass bed on a sandy bottom in clear shallow water next to mangrove roots

Neighbours and view lines

Miami-Dade uses a D-5 boundary to protect neighbours' view and access. A dock beyond it may need consent letters from adjacent owners.[7]

Monroe County dock length special exception
ItemFigure
Application fee$1,450
Notice fee$3 per shoreline owner within 300 ft
Site plan byFlorida registered architect, engineer or landscape architect
Source: Monroe County Planning and Environmental Resources Department, Dock Length Special Exception Application (Last revised August 2026). Last updated October 28, 2026.

Frequently asked questions

How much does a special exception for dock length cost?

$1,450, plus $3 for each shoreline property owner within 300 ft, per the application revised August 2026.

Sources

  1. Dock Length Special Exception Application (Last revised August 2026), Monroe County Planning and Environmental Resources Department. Accessed October 27, 2026.
  2. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  3. Cost to Build a Dock (updated 31 Jan 2025), Fixr.com (secondary national cost guide). Accessed October 27, 2026.
  4. Monroe County Land Development Code, Sec. 118-12 Shoreline Setback, subsections (k) Bulkheads, seawalls and riprap and (m) Docking facilities (third-party code copy), Monroe County, Florida (text reproduced by Zoneomics; the official Municode copy blocked automated access). Accessed October 28, 2026.
  5. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.
  6. Community Rating System (CRS), Monroe County, Florida. Accessed October 28, 2026.
  7. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  8. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  9. Dock Permitting in Florida: Permit Application Fee Schedule and Aquatic Preserve Design Criteria, Florida Department of Environmental Protection (FDEP). Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.