We seal cracks and leaking panel joints, rebuild spalled caps, replace tiebacks and backfill washed-out soil, then tell you honestly whether repair still makes sense or the wall needs replacing.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Fort Lauderdale presumes a seawall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbouring property or the street; owners must show progress within 60 days and finish within 365 days (City of Fort Lauderdale, 2022). A Broward County license is needed before repair work starts.

Last updated

Signs you need seawall repair

Call us when you see any of these. Each one lets water and soil move through the wall, and the damage speeds up once it starts.

  • Cracks, spalling or rust stains on the cap or face
  • Open or leaking joints between panels
  • Sinkholes or soft ground just behind the wall
  • Water seeping through the wall at high tide
  • A cap or panels leaning toward the water

Typical project sizes

Repairs range from a few feet of crack sealing to rebuilding tiebacks along a whole lot. In Miami Beach a repair costing $300 or more per linear foot counts as substantial and must bring the wall up to 5.7 ft NAVD, so the size of a repair can change what the city requires.

Repairs that keep you out of trouble

Sealing open joints, rebuilding spalled caps and restoring fill behind the wall stop the three things the City looks for: erosion, material passing through and tidal water flowing through. The City's 2016 survey priced cap spall repair at about $60 per cubic foot of epoxy mortar and a new 12-inch cap at $75 to $125 per linear foot.[1][2]

Substantial repairs

New and substantially repaired tidal barriers must meet the 5 ft NAVD88 standard, so a large repair can turn into a raise. We check the scope against that rule before pricing.[1]

King tides and street flooding

The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.

Gap at the base of an old seawall at low tide with sand washing out from behind the wall

Before we price a repair we check whether its cost or extent would trigger the full height rule.[4][1]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[1][4]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[3][1]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

How do you repair a seawall?

We start with a close inspection at low tide to find where water and soil are moving. Then the fix matches the fault: crack injection or patching for the face, rebuilt concrete for spalled caps, new tie rods and anchors where the wall is leaning, and compacted fill behind the wall once it is sealed.

Vertical crack and spalled concrete exposing rusty rebar on a seawall face above the waterline
  1. Inspect the cap, face, joints and toe at low tide
  2. Confirm the permit path (exempt, expedited or short form)
  3. Seal joints and cracks, repair spalls
  4. Replace tiebacks or the cap if needed
  5. Backfill and restore the yard

Which seawall repairs need a permit?

Miami-Dade DERM lists as exempt: sealing cracks and spall repair on the cap or face, repair or sealing of pilasters, backfilling landward of an existing seawall, riprap or gunite tubes under an undercut wall no more than 2 ft waterward, and sand-cement bags at the toe no more than 2 ft waterward. Cap and tieback repair or replacement need structurally approved plans from the building department and an expedited DERM authorisation. Your city may still need a building permit.[8]

Repair or replace?

If the panels are sound and the wall is tall enough for local rules, repair is usually the better value. If repairs would cross a city's substantial repair line, such as $300 per linear foot in Miami Beach, you may have to raise the whole wall anyway, and replacement can make more sense.[9]

Trench behind a seawall exposing a steel tie rod running back to a concrete anchor
Seawall repair cost and permit figures
ItemFigureSource year
Cap spall repair$60 per cubic foot of epoxy mortar2016 (Fort Lauderdale)
Adding a 12-inch cap to an existing wall$75 to $125 per linear foot2016 (Fort Lauderdale)
DERM expedited review, seawall cap replacement$752025 (Miami-Dade)
DERM expedited review, tie rod replacement$752025 (Miami-Dade)
Miami Beach substantial repair threshold$300 or more per linear foot2025 (Miami Beach)
DERM fees carry a 7.5% surcharge. 2016 prices pre-date recent cost rises. Sources: Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017); Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025); City of Miami Beach, Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25). Last updated October 28, 2026.

Frequently asked questions

Do I need a license to repair my seawall in Fort Lauderdale?

Yes, a Broward County license is required before any work in or over county waters, plus the City's building permit.

How long do I have to fix a seawall the City says is in disrepair?

60 days to show progress and 365 days to complete the work.

Sources

  1. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  2. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  3. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  4. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  5. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  6. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  7. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  8. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  9. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.