Seawall replacement in Fort Lauderdale

Seawall replacement for Fort Lauderdale homes, built to the City's 5 ft NAVD88 standard.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

We design and build replacement seawalls with engineered drawings, the county and city permits, and a turbidity barrier in the water while we work.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Fort Lauderdale requires 5 ft NAVD88 for new and substantially repaired seawalls, or 4 ft until 2035 if the wall can be raised to 5 ft by 2050. Fort Lauderdale's tide swings 2.79 ft near Port Everglades but 2.28 ft up the New River, so lift travel depends on where you are.

Last updated

When replacement makes sense

Replacement is the answer when panels are cracked through, the wall leans, repairs would cost more than half of a new wall, or the wall is too low for your city's new standard.

  • Panels cracked through or leaning
  • Repeated sinkholes despite repairs
  • A city notice to raise or rebuild
  • Planned dock or lift work that needs a sound wall

Typical project sizes

On a 75 foot lot, the 2016 range of $650 to $2,000 per linear foot works out at roughly $48,750 to $150,000 before engineering, permits and any dock or lift reset. Today's prices are higher than in 2016.

5 ft NAVD88, with a path to 2050

New and substantially repaired tidal barriers in Fort Lauderdale must reach 5 ft NAVD88. A wall permitted before 1 January 2035 may be built at 4 ft NAVD88 if it is designed to be raised to 5 ft by 1 January 2050, which is how many owners spread the cost.

A replacement wall is built to the current height from the start, so the panels, piles and cap are sized for it.[1]

River tide and inlet tide

NOAA's South Port Everglades gauge shows a 2.79 ft great diurnal range, while the Andrews Avenue bridge gauge up the New River shows 2.28 ft, with mean higher high water about 0.45 to 0.57 ft above NAVD 88 (1983 to 2001 epoch). Lifts and floating docks near the inlet need more travel than those up the river.

The tide also sets how much of the wall can be worked on dry at low water, which changes crew time.[2][3]

Cap repairs and cap additions, priced

The same City material priced cap spall repair at $60 per cubic foot of epoxy mortar and adding a 12 in cap to an existing wall at $75 to $125 per linear foot (2016 figures). Whether an old wall can carry a taller cap is an engineering question, so a marine or structural engineer checks it first.

Newly installed precast seawall panels with a fresh cap beside an older dark neighbouring wall

Replacement sits at the top of that range when the waterway is deep or the barge access is tight.[4]

What the City's contractor survey found

When Fort Lauderdale surveyed seawall contractors in 2016, quotes ran from $650 to $2,000 per linear foot depending on waterway depth and where the wall sits, plus $2,000 to $5,000 per job for engineering and permitting. The deep finger isle canals sit at the expensive end because panels and piles are longer.

A full replacement needs the complete permit set, so we start on drawings and surveys early.[4]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[1][5]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[6][1]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

What a seawall replacement involves

A Florida engineer designs the wall to the site's soil, water depth and the local top elevation. Most replacements go in front of the old wall, which stays in place as backing, because removing it can undermine the yard.

Precast concrete seawall panels and rebar cages staged on a waterfront lot beside a canal
  1. Survey and engineered drawings
  2. DERM, city and state approvals
  3. Turbidity barrier and manatee watch in the water
  4. New panels or sheet piles, tiebacks and cap
  5. Backfill, drainage and yard restoration

How far out can the new wall go?

Florida Statute 403.813 exempts restoring a seawall at its previous location, upland of it, or within 18 inches waterward of it. Miami-Dade's short form and the federal SPGP VI use the same 18 inch line, measured wet face to wet face, and need no seagrass survey within it.[12][11][13]

Federal permits

Under SPGP VI, the Florida DEP could verify the federal Army Corps authorisation for qualifying seawall work along with the state decision. That permit's stated expiration date was 27 July 2026, and we have not been able to confirm a replacement, so for each job we confirm the federal route with the agencies before we file.[13][14]

Working around manatees

Permits attach the state's Standard Manatee Conditions: all in-water work stops if a manatee comes within 50 ft, and resumes only once it has moved beyond 50 ft or 30 minutes pass without it reappearing. Turbidity barriers must not entangle or block manatees.[15]

Yellow turbidity curtain enclosing a seawall work area on a calm canal
Seawall replacement costs
ItemFigureYear and place
New or replacement seawall$650 to $2,000 per linear foot2016, Fort Lauderdale
Engineering and permitting$2,000 to $5,000 per job2016, Fort Lauderdale
Old seawall brought up to code$1,000 to $1,500 per linear foot2017, Miami Beach
DERM application fee, $20,000 to $74,999 job$470 plus $25 per $1,000 above $10,0002025, Miami-Dade
DERM fees carry a 7.5% surcharge and a separate permit fee. Sources: Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017); City of Miami Beach, Rising Above the Risk: Frequently Asked Questions (05/05/2017); Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025). Last updated October 28, 2026.

Frequently asked questions

How high does a seawall need to be in Fort Lauderdale?

5 ft NAVD88 for new and substantially repaired walls. Walls permitted before 1 January 2035 can be 4 ft if designed to be raised to 5 ft by 1 January 2050.

How much does the tide move in Fort Lauderdale?

About 2.79 ft (great diurnal range) at South Port Everglades and 2.28 ft at the Andrews Avenue bridge on the New River, per NOAA's 1983 to 2001 datums.

Can I just add a cap to reach 5 ft in Fort Lauderdale?

Often, if an engineer confirms the old wall can carry the weight. The City's 2016 figures put a 12 in cap addition at $75 to $125 per linear foot.

How much does a seawall cost in Fort Lauderdale?

The City's 2016 survey of contractors found $650 to $2,000 per linear foot, plus $2,000 to $5,000 per job for engineering and permits. Today's prices are higher, so we quote each job.

Sources

  1. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  2. Datums for station 8722956, South Port Everglades, ICWW (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  3. Datums for station 8722937, Fort Lauderdale, Andrews Ave. Bridge (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  4. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  5. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  6. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  7. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  8. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  9. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  10. Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
  11. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  12. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  13. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  14. Federal Permits and Coordination Agreements Between DEP, WMDs, and the U.S. Army Corps of Engineers, Florida Department of Environmental Protection (FDEP). Accessed October 28, 2026.
  15. Standard Manatee Conditions for In-Water Work (2011), Florida Fish and Wildlife Conservation Commission (FWC). Accessed October 27, 2026.