When water scours under the toe of a wall, the wall starts to tip. Riprap and toe repairs stop that, and some are permit-exempt in Miami-Dade.
- Free, no-obligation quote
- Fast response from our team
- Miami-Dade, Broward, Palm Beach and the Keys
The short answer
Fort Lauderdale can cite owners whose seawalls let king tide water reach the street, and asks for overtopped walls to be raised to 5 ft. Fort Lauderdale's own 2016 survey found seawall work at $650 to $2,000 per linear foot, plus $2,000 to $5,000 for engineering and permits.
Last updated
Signs the toe needs work
Look for these at low tide.
- A gap or hollow under the base of the wall
- Wall tipping toward the water
- Soil loss behind the wall with no visible crack
- Strong wakes or currents along the lot
Typical project sizes
Toe repairs often cover the worst few sections of wall; riprap revetments usually run the full frontage. The state general permit covers up to 100 linear feet of riprap at a slope no steeper than 2:1.
King tides and street flooding
The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.
Knowing where that line sits lets you choose between a repair now and a full raise later with your eyes open.[1][2]
What the City's contractor survey found
When Fort Lauderdale surveyed seawall contractors in 2016, quotes ran from $650 to $2,000 per linear foot depending on waterway depth and where the wall sits, plus $2,000 to $5,000 per job for engineering and permitting. The deep finger isle canals sit at the expensive end because panels and piles are longer.
Use those figures as a starting point and expect a quote based on your wall's length, depth and access.[3]
The Broward County license comes first
Broward County requires its own license before any work in, on, over or under county waters, and that includes repairing or replacing a dock or seawall. Pile replacement, lift repairs that touch the pilings and seawall work all need that county license before work starts, on top of the City permit.

Toe protection usually costs a fraction of a new wall and fits that permit route.[4]
What makes Fort Lauderdale different
The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[2][1]

The county layer
Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[4][2]

Permits in Fort Lauderdale
- Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
- City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.
What riprap does
Riprap is a sloped layer of large rock at the base of a seawall. It breaks wave energy and stops the water from scouring sand out from under the toe. Red mangroves can grow between the rocks, which is the idea behind living shorelines.

Riprap limits and permits
Under SPGP VI, new riprap may extend no more than 10 ft waterward of the mean high water line, and repair or replacement no more than 18 inches beyond the previous footprint. Miami-Dade allows natural limerock boulder riprap on a 2:1 slope up to 10 ft waterward through an expedited authorisation after inspection.[9][8]
| Work | Rule | Fee |
|---|---|---|
| Riprap or gunite tube under undercut wall, up to 2 ft waterward | DERM exempt | None from DERM |
| Sand-cement bags at toe, up to 2 ft waterward | DERM exempt | None from DERM |
| Limerock boulder riprap, 2:1 slope, up to 10 ft waterward | DERM expedited after inspection | $170 inspection |
| Up to 100 linear ft of riprap at 2:1 or flatter | State general permit (62-330.431) | Set by FDEP |
Frequently asked questions
Can Fort Lauderdale make me fix my seawall?
Yes. The City can cite walls that contribute to tidal flooding of the street, and after notice owners have 60 days to show progress and 365 days to finish.
How much does a seawall cost in Fort Lauderdale?
The City's 2016 survey of contractors found $650 to $2,000 per linear foot, plus $2,000 to $5,000 per job for engineering and permits. Today's prices are higher, so we quote each job.
Do I need a county license to repair my dock in Fort Lauderdale?
Yes. Broward County requires a license before any work in, on, over or under its waters, including repair or replacement of a dock or seawall.
Sources
- King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
- City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
- Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
- Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.