We repair cracked caps and leaking joints, replace failing walls, raise seawalls to new city heights and protect the toe with riprap, across Miami-Dade, Broward, Palm Beach and the Keys.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Fort Lauderdale requires new and substantially repaired seawalls to reach at least 5 ft NAVD88, and walls permitted before 1 January 2035 may be built at 4 ft if designed to reach 5 ft by 1 January 2050 (City of Fort Lauderdale, 2022). The City's own 2016 contractor survey priced new or replacement walls at $650 to $2,000 per linear foot.

Last updated

Typical project sizes

Most residential lots have 50 to 150 feet of waterfront, so a full replacement is usually a five or six figure project, while cap, crack and tieback repairs are much smaller. Fort Lauderdale's 2016 survey priced engineering and permitting alone at $2,000 to $5,000 per job.

Costs from the City's own survey

In May and June 2016 the City surveyed seawall contractors and found $650 to $2,000 per linear foot, depending on waterway depth and wall location, plus $2,000 to $5,000 per job for engineering and permitting. Its ordinance FAQ assumed a design life of about 50 years.[2]

Before any work starts

Broward County requires its license before any work in, on, over or under county waters, and that includes repairing or replacing a seawall. The City's building permit comes alongside it.[3]

5 ft NAVD88, with a path to 2050

New and substantially repaired tidal barriers in Fort Lauderdale must reach 5 ft NAVD88. A wall permitted before 1 January 2035 may be built at 4 ft NAVD88 if it is designed to be raised to 5 ft by 1 January 2050, which is how many owners spread the cost.

Freshly poured smooth concrete seawall cap with timber formwork along the edge

Height is the first question on any wall job here, because it decides whether a repair can stay at the current cap or turns into a raise.[1]

River tide and inlet tide

NOAA's South Port Everglades gauge shows a 2.79 ft great diurnal range, while the Andrews Avenue bridge gauge up the New River shows 2.28 ft, with mean higher high water about 0.45 to 0.57 ft above NAVD 88 (1983 to 2001 epoch). Lifts and floating docks near the inlet need more travel than those up the river.

The tide also sets how much of the wall can be worked on dry at low water, which changes crew time.[4][5]

King tides and street flooding

The City tells owners to inspect and maintain their seawalls, says walls overtopped by king tides should be raised to the 5 ft standard, and can cite owners whose walls let tidal water reach the street. A low spot or a leaking joint is a code issue here, not only a maintenance one.

Knowing where that line sits lets you choose between a repair now and a full raise later with your eyes open.[6][1]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[1][6]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[3][1]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits for seawalls in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

Which permits does seawall work need?

In Miami-Dade, any work in, on, over or upon tidal waters needs a DERM Class I permit under Section 24-48 of the County Code, including inside cities. Minor repairs are exempt, cap and tieback work gets an expedited authorisation, and rebuilding a wall at the mean high water line or up to 18 inches waterward is a short-form permit approved by staff.

The city building department also issues a structural permit. A state exemption does not remove county and city permits: Florida Statute 403.813 says its exemptions do not relieve anyone from county and municipal requirements, so in Miami-Dade a DERM Class I permit still applies.[10][11]

How long does a seawall last?

Fort Lauderdale's seawall ordinance FAQ assumed a design life of about 50 years, and city engineers described a 30 to 50 year lifespan for a wall built today. Salt water, wave action from boat wakes and rising tides shorten that when cracks and failed joints are left open.[2]

Precast concrete seawall panels and rebar cages staged on a waterfront lot beside a canal

Why heights matter now

Cities are raising the bar. Miami Beach requires new and substantially repaired seawalls to reach 5.7 ft NAVD, Coral Gables sets bulkheads at a minimum of 6 ft NGVD 1929, and Fort Lauderdale requires 5 ft NAVD. A repair that triggers these rules can turn into a raising job, so we check the local standard before we price.[12][13][1]

High water reaching the top of a raised concrete seawall cap on a bay-side residential canal
Fort Lauderdale seawall figures
ItemFigureSource year
Minimum top elevation5 ft NAVD882022 staff report
Interim option4 ft if designed for 5 ft by 1 Jan 2050 (permits before 1 Jan 2035)2022 staff report
New or replacement wall$650 to $2,000 per linear foot2016 survey
Engineering and permitting$2,000 to $5,000 per job2016 survey
After a disrepair finding60 days to show progress, 365 days to finish2022 staff report
Sources: City of Fort Lauderdale, Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3); Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017). Last updated October 28, 2026.

Frequently asked questions

What does a seawall cost in Fort Lauderdale?

The City's 2016 contractor survey found $650 to $2,000 per linear foot, plus $2,000 to $5,000 for engineering and permits. Prices are higher today.

When must my Fort Lauderdale seawall be raised?

When you build new or substantially repair it. Walls permitted before 1 January 2035 may go in at 4 ft if designed to reach 5 ft by 1 January 2050.

Sources

  1. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  2. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  3. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  4. Datums for station 8722956, South Port Everglades, ICWW (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  5. Datums for station 8722937, Fort Lauderdale, Andrews Ave. Bridge (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  6. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  7. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  8. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  9. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  10. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  11. Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
  12. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  13. CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.