Seawall caps in Fort Lauderdale, built to the City's 5 ft NAVD88 standard.

Free Fast Quote

Please fill out this form to request a free quote on your upcoming project and we will respond to you right away!

A new cap seals the top of the wall, ties the panels together and can add height. We check first that the existing wall can carry the extra weight.

  • Free, no-obligation quote
  • Fast response from our team
  • Miami-Dade, Broward, Palm Beach and the Keys

The short answer

Fort Lauderdale requires 5 ft NAVD88 for new and substantially repaired seawalls, or 4 ft until 2035 if the wall can be raised to 5 ft by 2050. Fort Lauderdale's own 2016 survey found seawall work at $650 to $2,000 per linear foot, plus $2,000 to $5,000 for engineering and permits.

Last updated

When a new cap is the right fix

A cap replacement suits a wall whose panels are sound but whose cap is cracked, spalled or too low.

  • Cracked or spalled cap with rust staining
  • Wall a little below the city's new height
  • Panels separating at the top

Typical project sizes

Cap jobs usually run the full length of the lot. At the 2016 rate of $75 to $125 per linear foot, a 12-inch cap on 75 feet of wall is about $5,625 to $9,375 before permits.

5 ft NAVD88, with a path to 2050

New and substantially repaired tidal barriers in Fort Lauderdale must reach 5 ft NAVD88. A wall permitted before 1 January 2035 may be built at 4 ft NAVD88 if it is designed to be raised to 5 ft by 1 January 2050, which is how many owners spread the cost.

A new cap is often the cheapest way to reach that height, if the old wall can carry the extra weight.[1]

What the City's contractor survey found

When Fort Lauderdale surveyed seawall contractors in 2016, quotes ran from $650 to $2,000 per linear foot depending on waterway depth and where the wall sits, plus $2,000 to $5,000 per job for engineering and permitting. The deep finger isle canals sit at the expensive end because panels and piles are longer.

Cap work is priced per linear foot, so those figures translate directly to your frontage.[2]

Cap repairs and cap additions, priced

The same City material priced cap spall repair at $60 per cubic foot of epoxy mortar and adding a 12 in cap to an existing wall at $75 to $125 per linear foot (2016 figures). Whether an old wall can carry a taller cap is an engineering question, so a marine or structural engineer checks it first.

Vertical crack and spalled concrete exposing rusty rebar on a seawall face above the waterline

A cap replacement can count as substantial work, so we check the trigger before design.[2]

River tide and inlet tide

NOAA's South Port Everglades gauge shows a 2.79 ft great diurnal range, while the Andrews Avenue bridge gauge up the New River shows 2.28 ft, with mean higher high water about 0.45 to 0.57 ft above NAVD 88 (1983 to 2001 epoch). Lifts and floating docks near the inlet need more travel than those up the river.

Caps are formed and poured above the water, but the tide decides how high the new cap must sit to give real freeboard.[3][4]

What makes Fort Lauderdale different

The City treats seawalls as tidal barriers. It presumes a wall is in disrepair if it lets upland soil erode, lets material pass through it, or lets tidal water flow unimpeded onto neighbours or the street, and gives owners 60 days to show progress and 365 days to finish. The City also spends $1.5 million a year on its own seawalls.[1][5]

Seawall with a fresh raised cap on a deep residential canal with a large yacht moored alongside

The county layer

Broward County requires a license before any work in, on, over or under its waters, including repairing or replacing a dock or seawall. Broward's regional policy is a consistent top elevation of 5 ft NAVD for seawalls, banks and berms.[6][1]

Long marginal dock along a seawall with a large private yacht moored at a modern home

Permits in Fort Lauderdale

  • Broward County environmental licensing: A county license before any work in, on, over or under Broward County waters, including dock and seawall repair.
  • City of Fort Lauderdale: Building permits; waivers of the dock and lift projection limit go to the City Commission with a Marine Advisory Board recommendation.
  • Florida DEP or South Florida Water Management District: State permit or exemption for docks and walls on the New River and the Intracoastal, on top of the Broward County license.
  • US Army Corps of Engineers, Jacksonville District: Federal authorisation for work in the Intracoastal Waterway and other navigable waters.

Can the wall take a new cap?

Not always. Whether a cap can be added depends on whether the existing wall can bear the weight, which a marine or structural engineer must assess. A wall that cannot take it needs replacing instead.[2]

Freshly poured smooth concrete seawall cap with timber formwork along the edge

Permits for cap work

Miami-Dade DERM gives cap repair or replacement an expedited administrative authorisation when the building department has approved the structural plans. At the state level, seawall caps, batter piles and king piles used only to stabilise and repair seawalls fall under an exemption in rule 62-330.051(12)(d).[10][11]

Caps and city height rules

In Miami Beach a wall may be built to 4 ft NAVD if it is designed to support a future 5.7 ft NAVD, so the cap and footing need to be designed for that later raise. In Boca Raton the city must approve a location survey before the cap is poured, and a final engineer report confirms the cap elevation.[12][13]

Seawall cap cost and permit figures
ItemFigureSource year
New 12-inch cap$75 to $125 per linear foot2016 (Fort Lauderdale)
Cap spall repair$60 per cubic foot of epoxy mortar2016 (Fort Lauderdale)
DERM expedited cap review$75 plus 7.5% surcharge2025 (Miami-Dade)
Sources: Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material), Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017); Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section, Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025). Last updated October 28, 2026.

Frequently asked questions

How high does a seawall need to be in Fort Lauderdale?

5 ft NAVD88 for new and substantially repaired walls. Walls permitted before 1 January 2035 can be 4 ft if designed to be raised to 5 ft by 1 January 2050.

How much does a seawall cost in Fort Lauderdale?

The City's 2016 survey of contractors found $650 to $2,000 per linear foot, plus $2,000 to $5,000 per job for engineering and permits. Today's prices are higher, so we quote each job.

Can I just add a cap to reach 5 ft in Fort Lauderdale?

Often, if an engineer confirms the old wall can carry the weight. The City's 2016 figures put a 12 in cap addition at $75 to $125 per linear foot.

How much does the tide move in Fort Lauderdale?

About 2.79 ft (great diurnal range) at South Port Everglades and 2.28 ft at the Andrews Avenue bridge on the New River, per NOAA's 1983 to 2001 datums.

Sources

  1. Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
  2. Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
  3. Datums for station 8722956, South Port Everglades, ICWW (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  4. Datums for station 8722937, Fort Lauderdale, Andrews Ave. Bridge (tidal epoch 1983 to 2001), NOAA Center for Operational Oceanographic Products and Services (CO-OPS), Tides and Currents. Accessed October 28, 2026.
  5. King Tides and High Tides, City of Fort Lauderdale. Accessed October 27, 2026.
  6. Do I need a license to replace or repair my dock / seawall?, Broward County (311 knowledge base, Environmental Protection and Growth Management). Accessed October 28, 2026.
  7. City Commission Agenda Memo #26-0535: Waiver of Limitations at 1614 Brickell Drive for one boat lift (16 Jun 2026), City of Fort Lauderdale. Accessed October 28, 2026.
  8. Community Rating System (Flood), City of Fort Lauderdale, Development Services. Accessed October 28, 2026.
  9. Floodproofing (glossary), Federal Emergency Management Agency (FEMA). Accessed October 27, 2026.
  10. Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
  11. Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
  12. Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
  13. Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.