The short answer
In Boca Raton, seawalls fall under Chapter 22 (Marine Structures) of the City Code, and plan review needs a survey of the seawall wet face, property line and piles plus section details showing the finished cap elevation (City of Boca Raton). The City approves a location survey before the cap is poured.
Last updated
Typical project sizes
Most residential lots have 50 to 150 feet of waterfront, so a full replacement is usually a five or six figure project, while cap, crack and tieback repairs are much smaller. Fort Lauderdale's 2016 survey priced engineering and permitting alone at $2,000 to $5,000 per job.
Height and future raise
Boca Raton's Engineering Design Standards Manual sets the elevation of any new or replaced seawall between 4.0 and 6.0 ft NAVD88, requires the wall to be designed to take another 12 to 18 inches later without alteration, and puts the seawall's wet face on the property line.[3]
Inspection sequence
Location survey approved before the cap pour and before the structural cap and piling inspections; final engineer report on the cap elevation, with photos, after construction. Missing a step stalls the job, so we book surveys into the schedule.[1]
Costs for scale
Fort Lauderdale's 2016 survey, the nearest government price data, found $650 to $2,000 per linear foot for new or replacement walls, and $2,000 to $5,000 for engineering and permits.[2]

What makes Boca Raton different
Plan review needs a current-conditions survey showing the seawall wet face or bulkhead line, the property line and piles, section details with the finished cap elevation, and a proposed site plan. Inspections are staged: a location survey before the cap is poured and before the structural cap and piling inspections, a final engineer report on cap elevation with photos, and a final marine structure survey for docks and lifts.[1]

Agencies beyond the City
Palm Beach County's marine structure checklist for unincorporated areas lists the outside approvals agencies expect to see: FDEP, the Florida Inland Navigation District (FIND) and the Army Corps, as applicable. That checklist is dated 2005, so we confirm current requirements for each job. The federal seagrass range used in dock design covers Palm Beach County waters.[4][5]

Permits for seawalls in Boca Raton
- City of Boca Raton Development Services: Marine structure permits under City Code Chapter 22, with staged survey and engineer inspections.
- Florida Inland Navigation District (FIND): May be involved for work along the Intracoastal Waterway.
- Florida DEP or South Florida Water Management District: State permit or exemption for docks, walls and lifts on Lake Boca Raton and the Intracoastal Waterway.
- US Army Corps of Engineers, Jacksonville District: Federal authorisation along the Intracoastal, which the Palm Beach County checklist expects to see with the building permit.
Which permits does seawall work need?
In Miami-Dade, any work in, on, over or upon tidal waters needs a DERM Class I permit under Section 24-48 of the County Code, including inside cities. Minor repairs are exempt, cap and tieback work gets an expedited authorisation, and rebuilding a wall at the mean high water line or up to 18 inches waterward is a short-form permit approved by staff.
The city building department also issues a structural permit. A state exemption does not remove county and city permits: Florida Statute 403.813 says its exemptions do not relieve anyone from county and municipal requirements, so in Miami-Dade a DERM Class I permit still applies.[7][8]
How long does a seawall last?
Fort Lauderdale's seawall ordinance FAQ assumed a design life of about 50 years, and city engineers described a 30 to 50 year lifespan for a wall built today. Salt water, wave action from boat wakes and rising tides shorten that when cracks and failed joints are left open.[2]

Why heights matter now
Cities are raising the bar. Miami Beach requires new and substantially repaired seawalls to reach 5.7 ft NAVD, Coral Gables sets bulkheads at a minimum of 6 ft NGVD 1929, and Fort Lauderdale requires 5 ft NAVD. A repair that triggers these rules can turn into a raising job, so we check the local standard before we price.[9][11][12]

| Item | Figure | Year and place |
|---|---|---|
| New or replacement seawall | $650 to $2,000 per linear foot | 2016, Fort Lauderdale contractor survey |
| Bringing an old seawall up to code | $1,000 to $1,500 per linear foot | 2017, Miami Beach rule of thumb |
| Engineering and permitting | $2,000 to $5,000 per job | 2016, Fort Lauderdale |
| Adding a 12-inch cap | $75 to $125 per linear foot | 2016, Fort Lauderdale |
| Cap spall repair | $60 per cubic foot of epoxy mortar | 2016, Fort Lauderdale |
Seawalls services in Boca Raton
Seawall repair in Boca Raton
Crack and spall repair, joint sealing, tiebacks, pilasters and backfill.
Seawall replacement in Boca Raton
New concrete seawalls, usually built just in front of the failing wall.
Seawall caps in Boca Raton
New and replacement concrete caps, including caps that raise the wall.
Seawall raising in Boca Raton
Raising walls to Miami Beach, Coral Gables and other city height standards.
Riprap and toe protection in Boca Raton
Limerock boulders, gunite tubes and sand-cement bags at the base of the wall.
Seawall inspections in Boca Raton
Low-tide condition checks, including after a city notice or before a sale.
Frequently asked questions
Does Boca Raton have a minimum seawall height?
Yes: 4.0 ft NAVD88 minimum and 6.0 ft NAVD88 maximum for any new or replaced seawall, under the City's Engineering Design Standards Manual. The final engineer report records the cap elevation.
What does a seawall cost in Boca Raton?
No Boca-specific government figure exists that we know of. Fort Lauderdale's 2016 survey found $650 to $2,000 per linear foot.
Sources
- Seawalls and Marine Structures, City of Boca Raton. Accessed October 27, 2026.
- Seawalls and Sea Level Rise Induced Flooding (Florida Sea Grant compilation, includes City of Fort Lauderdale 'Frequently Asked Questions: Seawall Ordinance Implementation', 25 Jan 2017), Florida Sea Grant (reproducing City of Fort Lauderdale and Florida Bar ELULS material). Accessed October 27, 2026.
- Engineering Design Standards Manual, section 7.7 Minimum Criteria for Waterway Features (PDF modified 10 Apr 2025), City of Boca Raton. Accessed October 28, 2026.
- TYPE 8 Marine Structures (Dock, Seawall, Boatlift, Boathouse) Application Submittal Checklist, Palm Beach County Planning, Zoning and Building. Accessed October 27, 2026.
- Department of the Army State Programmatic General Permit VI (SPGP VI), SAJ-2015-2575, State of Florida, U.S. Army Corps of Engineers, Jacksonville District (document hosted by Florida DEP). Accessed October 27, 2026.
- Insure Your Property, City of Boca Raton. Accessed October 28, 2026.
- Class I Permit Application for Coastal Construction and Mangrove Trimming within Miami-Dade County (Revised May 2025), Miami-Dade County RER, Division of Environmental Resources Management (DERM), Coastal Resources Section. Accessed October 27, 2026.
- Florida Statutes 2026, Section 403.813: Permits issued at district centers; exceptions, The Florida Legislature (Online Sunshine). Accessed October 27, 2026.
- Seawall FAQs (Miami Beach Rising Above, PDF dated 6.16.25), City of Miami Beach. Accessed October 27, 2026.
- Rising Above the Risk: Frequently Asked Questions (05/05/2017), City of Miami Beach. Accessed October 27, 2026.
- CAO 2022-007: Legal Opinion Regarding Scrivener's Error in Zoning Code 3-706 Bulkheads and Retaining Walls (17 Aug 2022), City of Coral Gables, City Attorney. Accessed October 27, 2026.
- Staff Report, Planning and Zoning Board, 16 Nov 2022, Case UDP-T22010 (Tidal barrier / seawall ordinance amendment, ULDR 47-19.3), City of Fort Lauderdale. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.